LS Joinery & Construction

LS Joinery & Construction Welcome to LS Joinery We are a reliable company based in Burnley, Lancashire, with over 10 years experience of working within the Construction Industry.

https://www.facebook.com/share/p/1GerkELLPa/?mibextid=wwXIfr
07/04/2026

https://www.facebook.com/share/p/1GerkELLPa/?mibextid=wwXIfr

Thinking about extending your home in Burnley?

Before you start any work, take a look at our Burnley Guide to Renovating Your Home. It covers planning permission, building regulations and the steps you may need to take locally.

And find out more about building control applications here:
https://burnley.gov.uk/planning/building-control/building-control-applications/

Read the guide here:
https://gtryh-burnley-ei5tw4tu.d1hneu19mk6m9.amplifyapp.com/

We’re back and what a day it’s turned out to be!    Happy New Year everyone, we hope you all enjoyed the Christmas holid...
05/01/2026

We’re back and what a day it’s turned out to be! Happy New Year everyone, we hope you all enjoyed the Christmas holidays.

Here we completed a full roof replacement as the existing tiles had deteriorated due to there age. We re-tiled the main ...
16/11/2025

Here we completed a full roof replacement as the existing tiles had deteriorated due to there age.
We re-tiled the main roof of the property, stripped off the existing dorma roof and installed a new roof deck so that we could install a new rubber roof system.
We also removed the existing timber cladding and replaced it with new anthracite cladding, fascia boards, guttering and downpipes.

If you are looking to have new roof, fascias boards, soffits, guttering or cladding then please give us a call.

15/11/2025
15/11/2025

Phase 4 of our Burnley Youth Theatre Project that we completed earlier this year.

We completed the full refurbishment of the Moira Preston Building at BYT which included the following works;
• Full removal of existing kitchen, toilets, walls and floor tiles.
• A new liquid DPM to the floor, a full floor screed & new Accoustic safety floor covering.
• New kitchen area with a more useable area for BYT Guests
• New disability toilets complete with compact laminate wall panelling for a high quality and extremely durable finish, complete with hand dryer and baby changing facilities.

Phase 4 of our Burnley Youth Theatre Project that we completed earlier this year. We completed the full refurbishment of...
15/11/2025

Phase 4 of our Burnley Youth Theatre Project that we completed earlier this year.

We completed the full refurbishment of the Moira Preston Building at BYT which included the following works;
• Full removal of existing kitchen, toilets, walls and floor tiles.
• A new liquid DPM to the floor, a full floor screed & new Accoustic safety floor covering.
• New kitchen area with a more useable area for BYT Guests
• New disability toilets complete with compact laminate wall panelling for a high quality and extremely durable finish, complete with hand dryer and baby changing facilities.

Saturday morning job - installed a composite door, flag window, and additional garage window.
08/11/2025

Saturday morning job - installed a composite door, flag window, and additional garage window.

When the customer goes the extra mile after you’ve done a quick toilet replacement due to a small fracture causing a lea...
07/11/2025

When the customer goes the extra mile after you’ve done a quick toilet replacement due to a small fracture causing a leak in the kitchen 👌👌👌👌👌thanks Lauren Hope Adam Hope

Rest In Peace Alex ❤️
12/09/2025

Rest In Peace Alex ❤️

Address

Suite 207 Business First Centre
Burnley
BB126HH

Alerts

Be the first to know and let us send you an email when LS Joinery & Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to LS Joinery & Construction:

Share

Category