16/07/2026
Here’s a several jobs completed at one house this week including….
-removing the existing black glass job splash back
-tiling all the splashbacks above the countertops in the kitchen in beige metro tiles dotted with sage green tiles and mustard tiles
-changed both internal doors to solid pre finished white half glazed cottage style doors with all new chrome hardware
-removed the stud wall under stairs to open up the space
-removed the old 5” skirting and replaced with 6” Ta**us skirting
Also averted a potential Disaster when an old flexi pipe behind the toilet decided to pack in whilst I was there,managed to stop the leak and replaced the faulty pipe within the hour to get them back to normal 😁😁
Nice little downstairs transformation done
All ready for the new carpet and the customer to decorate 😁😁