02/10/2026
Another transformation completed.
The existing render was failing and preventing moisture from escaping the property, so we carefully removed it back to the original substrate and allowed the building time to breathe.
We then applied the correct system, using a lime basecoat and through-coloured lime render to help maintain breathability while providing a durable, high-quality finish.
To finish it off, we added a contrasting colour to the plinth β a simple detail that really brings the overall look together.
Another project where the right system and attention to detail make all the difference. π π¨ Ryan Hall PRB Systems Ltd Dax Vincent
Location - Burnham On Sea
Colour - Blanc De La Cotè Finition Fin