15/10/2026
Remember the dedicated ground-floor bedroom addition we shared a while back with "BEDROOM" spray-painted on the masonry walls? (Swipe to see where it started! ๐)
The team has made massive progress, and the room is now fully insulated, boarded, and freshly plastered!
What went into bringing this space to life:
๐งฑ Masonry & Insulation Layering: Building out the structural blockwork shell and packing continuous high-grade insulation to meet modern thermal standards.
โก First-Fix Integration: Running electrical conduits and backboxes seamlessly behind the walls before boarding.
๐ Precision Skim Plastering: Skimming the walls and ceiling to a smooth finish, ready for final decoration.
Whether itโs a dedicated accessible ground-floor bedroom, a home office, or a open-plan space, we manage every stage from raw foundations to the final skim coat.
Next step: second-fix electricals, flooring, and paint!