DPCI Bristol

DPCI Bristol Project Management, Consultancy, Kitchens, Fire Doors, Interior fit out and refurbishment contractor based in Bristol. Contact - [email protected]

18/06/2026

The Door Vacuum Challenge Is the Nemesis of Fire Door Works!.

Just revisited a proiect today and got reminded of the one thing that can bring even the best fire-door setup to its knees door vacuum.
Two Buildings botn Listed. Original external doors (untouchable). Tiny lobby. FD30 internal doors that almost closed... but that last 10mm fought back like a champ.
Classic pressure differential.

The fix ended up being a proper little balancing act:

β€’ Intumescent vent installed into the
internal lobby door
β€’ Closer adiustments - one sped up, one slowed down
β€’ Pressure finally equalised
β€’ And now... the door actually closes like it's supposed to whichever way you go in or out.

Amazing how a tiny lobby and a sealed-up listed door can create a mini airlock,
Sometimes it's not the hinges, not the seals, not the closer, it's the building trying to hold its breath.

Just one more door Vacuum to sort out somewhere else now.

1st Floor of glassroc beam encasement and fire rated ceiling nearing completion for  UK LTD in Central Bristol and ready...
16/06/2026

1st Floor of glassroc beam encasement and fire rated ceiling nearing completion for UK LTD in Central Bristol and ready for smoke taping. Now starting on the ground floor following the strip out of the old ceilings.

#

Kicking off another new project this week, back for Phase 2 of our Village Social Club Fire Door Upgrade Project in Sout...
09/06/2026

Kicking off another new project this week, back for Phase 2 of our Village Social Club Fire Door Upgrade Project in South Gloucestershire, another 7 doors to change over including new vision panels and certification of all doors.

Kicking off Tuesday with a new project in Central Bristol. Fire encasement of newly prepared structural beams with Glass...
02/06/2026

Kicking off Tuesday with a new project in Central Bristol. Fire encasement of newly prepared structural beams with Glassroc Board and Overvoarding of existing ceilings with Fireline board.

Just a reminder to arrange your fire door inspections. We provide a full fire door report including QR Codes for asset t...
21/05/2026

Just a reminder to arrange your fire door inspections. We provide a full fire door report including QR Codes for asset tracking along with a remedial action list.

Get in touch if we can help.

Just completed a nice fire door project in South Gloucestershire. Updating abd replacing fire doors for a social club fo...
28/04/2026

Just completed a nice fire door project in South Gloucestershire. Updating abd replacing fire doors for a social club following a fire risk assessment that was carried out.
All doors marked with a QR code and full installation report provided along with an upto date fire door report.

Will be returning for phase 2 of the project soon where more doors are required.

Did you know that Listed Buildings can also have their fire doors upgraded and that this is just as important as with ne...
07/04/2026

Did you know that Listed Buildings can also have their fire doors upgraded and that this is just as important as with newer buildings?.

Maintaining fire doors on new structures involves ensuring compliance with modern standards and utilizing readily available materials, while listed building doors require a delicate balance of preserving historical integrity and meeting safety regulations.
The process for listed buildings often involves using specialized techniques or bespoke materials to align with conservation guidelines, making it more complex and time-intensive. Despite these challenges, maintaining fire doors in listed buildings remains crucial, as it safeguards occupants while protecting the heritage of these architectural treasures, ensuring their legacy endures without compromising safety.

So if you have any modern or listed fire door requirements please get in touch. We can inspect, maintain and independently certify.

Stay compliant, stay safe πŸ”’Is your fire door's 12-month inspection due? Regular checks and maintenance ensure safety and...
12/03/2026

Stay compliant, stay safe πŸ”’

Is your fire door's 12-month inspection due? Regular checks and maintenance ensure safety and compliance, protecting lives and property. πŸ”₯

At DPCI, we not only provide certified fire door installations but also include detailed installation reports and product data sheets for every project. Trust us to keep your doors up to standard and your tenants safe.

Contact us today for inspections, maintenance, or new installations!

Project Win Starting next week. We have been awarded a project consisting of 40 fire door upgrades using the Framefit sy...
10/03/2026

Project Win Starting next week.

We have been awarded a project consisting of 40 fire door upgrades using the Framefit system in a unit at the mall in Bristol along with 3 double door sets to replaced.
All to be signed off and upgrades certified on completion.

Many new Firedoors later we are done. Just being final painted now.Been working on phase 1 of a large project with a reg...
05/03/2026

Many new Firedoors later we are done. Just being final painted now.

Been working on phase 1 of a large project with a regular customer supplying labour and assisting with making and installing bespoke fd60 doors and frames.

Address

Bristol
BS14

Alerts

Be the first to know and let us send you an email when DPCI Bristol posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to DPCI Bristol:

Share