20/01/2026
Good morning
Here is a full bathroom renovation I completed in November last year in crowthorne.
The original job spec was to removed current tiling. Install new shower tray whilst reusing the existing glass screen and install tiles of a similar format.
But that would be far too easy, and the game plan changed by the start date! We lost the shower cubicle walls back to bare walls so the area was reboarded with Jacko board to provide a waterproof backing to help prevent future water ingress. The floor was stripped back to chipboard and new decoupling mat laid and we were ready to the tiling trowels out!
The customer choose these gorgeous green tiles for the walls and toilet boxing. With white porcelain tiles for the floor and it would have been rude not to bring the porcelain up the walls as a skirting detail!
Nearly 600 tiles later this was the outcome! A space completely transformed, brighten up the room.
As I’ve said before I’ve been lucky to learn a lot of different aspects of work over my career, I may be a carpenter by trade but I can cover a wide range of work.
Please feel free to contact with any enquiries you may have currently taking bookings for mid February .
If you could spare a minute to like, follow or share it would be much appreciated
Have an awesome day
Many thanks
Myle
MRM Carpentry