SW Carpentry & Building - Shane Williams

SW Carpentry & Building - Shane Williams All Aspects of carpentry/building Work covered🪚

Twelve oak internal doors supplied & fitted 🚪 Over the last day and a half with chrome ironmongery ready to be oiled for...
20/03/2026

Twelve oak internal doors supplied & fitted 🚪
Over the last day and a half with chrome ironmongery ready to be oiled for great returning customers😊

New stairs fitted this week 🪚With an oak feature bullnose step,oak handrail and newel caps 🪵 Softwood spindles,newel pos...
13/03/2026

New stairs fitted this week 🪚
With an oak feature bullnose step,oak handrail and newel caps 🪵
Softwood spindles,newel posts and strings ready for painting !
Fully plastered the hallway and underneath the new stairs !
And finished the room off with some lovely reeded T & G effect wall paneling with a contemporary dado rail on top 😄
Our customer is over the moon with the make over👌🏻
Looking forward to seeing the finish results once the carpet has been layed and the woodwork has been oiled and painted 🎨

Bathroom refurb completed this week 👌🏻We changed the layout from a bath 🛀🏼 To a walk-in shower 🚿 At customers request!LV...
08/03/2026

Bathroom refurb completed this week 👌🏻
We changed the layout from a bath 🛀🏼
To a walk-in shower 🚿
At customers request!
LVT flooring layed✔️
Plastered walls and ceiling ✔️
Installed wall panels ✔️
Spotlights for a sleeker finish ✔️
And completed the room with a towel radiator and new door 🚪
Contact are page for a free quote if your looking to upgrade your bathroom !!!

Nice to go back to see this stunning 😄Mediawall we built last year now it’s been painted and ornamented !Very classy 👌🏻
04/03/2026

Nice to go back to see this stunning 😄
Mediawall we built last year now it’s been painted and ornamented !
Very classy 👌🏻

New loft hatch with attached ladder 🪜 Fitted this morning 🌅 We changed the direction it was fitted before hand for easie...
14/02/2026

New loft hatch with attached ladder 🪜
Fitted this morning 🌅
We changed the direction it was fitted before hand for easier access 🪚
To use and store items in the loft space !

Media wall fitted this week ✔️ Four days from start to finish 🪚Another big one at 5.5 metres long With an 65” wall mount...
24/01/2026

Media wall fitted this week ✔️
Four days from start to finish 🪚
Another big one at 5.5 metres long
With an 65” wall mounted tv 📺
And a 1.8 metre’s long 3 sided fireplace🔥
Spotlights were fitted in every alcove 💡
With extra sockets in the bottom two 🔌
Fully plastered and new coving fitted to match exsisting,all ready for painting 🎨
When the plaster dries 😄
Customers our over the moon with the job👌🏻
Message our page,if you’re looking to have one installed in the near future,or for any other building needs !!!

New staircase fitted this morning,with a quarter landing and double bullnose steps at the bottom 🪚Realigned the top land...
08/12/2025

New staircase fitted this morning,with a quarter landing and double bullnose steps at the bottom 🪚
Realigned the top landing so they are all one level now,as opposed to the three before 👌🏻
Handrails to be installed in the new year,so the customer has easier access too get materials upstairs as there currently renovating the whole house 🏠

Media wall completed today ✔️ This one is a beauty at 6.5 metres long😱With an 85” wall mounted tv 📺 And a 2 metres long ...
21/10/2025

Media wall completed today ✔️
This one is a beauty at 6.5 metres long😱
With an 85” wall mounted tv 📺
And a 2 metres long 3 sided fireplace🔥
Also spotlights in every alcove 💡
All fully plastered and new coving fitted ready for painting,when the plaster dries 👌🏻

Back to work on a job we did in the summer 🌞Now the weather isn’t as good,our customer wanted to extend the roofing area...
14/10/2025

Back to work on a job we did in the summer 🌞
Now the weather isn’t as good,our customer wanted to extend the roofing area and add guttering,so she can enjoy full use of the decking area in the winter months with her sister 🪚

Laminate flooring & skirting boards supplied and fitted over the last two days !And removal of understairs door 🚪Too an ...
11/10/2025

Laminate flooring & skirting boards supplied and fitted over the last two days !
And removal of understairs door 🚪
Too an access panel too create more room for a corner sofa 🛋️
With fresh plastering 😄
In this newly purchased property 🏠

Wall panelling fitted yesterday in penallta 😄On the hallway,landing and stairs,following the contour’s of the handrails ...
27/09/2025

Wall panelling fitted yesterday in penallta 😄
On the hallway,landing and stairs,following the contour’s of the handrails 🪚
With a square edging on top to finish it off,at clients request !
All ready for painting now 🎨
There was plenty of thinking involved on this job to get the angles right 📐
But we managed it,and went away with another happy customer 👌🏻

Address

Blackwood

Telephone

+447970182055

Website

Alerts

Be the first to know and let us send you an email when SW Carpentry & Building - Shane Williams posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share

Category