Kitchen damp works completed in 7 days.
Full team on this one.
This kitchen had to be fully dismantled so the damp works could be carried out properly.
The kitchen was removed, sockets were taken off, the affected walls were knocked off, and the area was reinstated using a cavity membrane system.
Once the damp proofing system was installed, the walls were fully skimmed out and the kitchen was reinstated.
There were also various other damp issues around the property which we identified and resolved as part of the works.
The tenant asked whether it was within the budget to upgrade the tiles and had a preference on the colour, so we made that happen as part of the job.
We also fitted brand new back boxes and sockets, along with replacing the stop tap and installing a new sink waste system.
Some of this wasn’t originally in the price, but our standard is simple:
We don’t want to leave a job just damp proofed.
We want to leave it better than when we found it.
All of this was completed within 7 days, working to a tight deadline as the tenant could only be out of the property for one week.
Finished photos of the kitchen and bedroom fully skirted and painted, will be uploaded in a later post.
One of the biggest benefits for our customers is that we handle the entire job from start to finish. There’s no need to organise multiple trades or deal with different contractors turning up at different times. We manage everything under one roof, from the initial damp proofing works right through to the reinstatement and finishing touches.
All qualifying damp proofing works are supplied with an insurance-backed guarantee for extra peace of mind.