Subsoil Land & Water Covering southern england we carry out land, water & forestry works covering a range of solutions for private & commercial clients.

Services include, Ditching - Vegetation clearance - Groundworks - Water supply installation & repair - Land drainage

We have filled one space but are still requiring one more additional trustworthy individual to work alongside various pr...
25/07/2026

We have filled one space but are still requiring one more additional trustworthy individual to work alongside various projects, 3 to 5 days a week is fine.
Primarily will be based on a project in surrey following a post driver for 4 - 6 months but may be called off for other aspects as business requires.
With an uptake in new works there are some exciting opportunities for the right individual within various fields or spread across all aspects if desired.
A good attitude & polite, ability to wake up, stay aways involved to some degree, ability to be trusted.

The big rig finally out of itโ€™s temporary retirement after an extensive amount of work ๐Ÿ™Œ๐Ÿผ๐Ÿ™๐Ÿป chooching on with the remap ...
25/07/2026

The big rig finally out of itโ€™s temporary retirement after an extensive amount of work ๐Ÿ™Œ๐Ÿผ๐Ÿ™๐Ÿป chooching on with the remap it doesnโ€™t even know itโ€™s loaded with a trailer. Impressed Celtic Tuning

Shaping up to be another nice dusty week in paradise, Laws Grab Services LTD getting an early jump on a bulk load of muc...
07/07/2026

Shaping up to be another nice dusty week in paradise, Laws Grab Services LTD getting an early jump on a bulk load of muckaway this morning โœ…๐Ÿป

After & Before from one of this weeks jobs amongst some clearance works โœ…Despite the heat this week and making a few wor...
26/06/2026

After & Before from one of this weeks jobs amongst some clearance works โœ…
Despite the heat this week and making a few work arounds for it, good progress made on the retention pond, PH1 of 5 ๐Ÿค™๐Ÿผ

Recent completion on one side of this project, all land cleared, waste processed and recycled. Land was stripped of tops...
20/06/2026

Recent completion on one side of this project, all land cleared, waste processed and recycled.
Land was stripped of topsoil to the point of location of a 3PH cable where we had to contour to allow for it to remain in place.
New french drain installed on LH side, 20mm supply pipe reinstated underneath the terram, layered up with 6f2 and then capped with planings to create a solid & long lasting surface for the new car park.
Any enquiries for machine works, water supply repairs or installations & utility installations.
Happy to help, fully insured & qualified.
Get in touch โ˜‘๏ธ๐Ÿค๐Ÿป

Good end to the week on this job, 137T of 6f2 sub base in & ready for a final grading before some planings, french drain...
12/06/2026

Good end to the week on this job, 137T of 6f2 sub base in & ready for a final grading before some planings, french drain installed and water pipe laid prior to the drainage going in.
Thankfully dry all day to get the lorries in.

11/06/2026

Loads coming in nice and steady today โ˜‘๏ธโœ…
If this weather can leave that would be great but good progress none the less

Cracking first week in on the new car park project.Vegetation stripped off โœ…Ash treeโ€™s removed โœ…Top soil stripped back โœ…...
07/06/2026

Cracking first week in on the new car park project.

Vegetation stripped off โœ…
Ash treeโ€™s removed โœ…
Top soil stripped back โœ…
Ready to get final grade for aggregate โœ…
Waste processed & in the skips โœ…
Log wood stacked ready to go โœ…
Topsoil relocated & bunded for future โœ…
Utilityโ€™s marked and located โœ…

All brash is due to be chipped so if anyone local requires any decent whole ash wood chip please let me know ๐Ÿ™๐Ÿป

07/06/2026

Cracking first week in on the new car park project.

Vegetation stripped off โœ…
Ash treeโ€™s removed โœ…
Top soil stripped back โœ…
Ready to get final grade for aggregate โœ…
Waste processed & in the skips โœ…
Log wood stacked ready to go โœ…
Topsoil relocated & bunded for future โœ…
Utilityโ€™s located & marked up โœ…

- All brash is due to be chipped so if anyone local requires any decent whole ash wood chip please let me know ๐Ÿ™๐Ÿป -

Both diggers on site today ๐Ÿ‘Œ๐Ÿผ๐Ÿ˜ one works slightly harder than the other ๐Ÿคท๐Ÿปโ€โ™‚๏ธ
03/06/2026

Both diggers on site today ๐Ÿ‘Œ๐Ÿผ๐Ÿ˜ one works slightly harder than the other ๐Ÿคท๐Ÿปโ€โ™‚๏ธ