03/04/2023
ISO Frame Systems | Military Offices
👉 Project prepared for Military offices with sleeping facilities.
👇🏻 Build from the ISO Frame Systems models below:
1. 38 x MB 20 (rooms)
2. 4 x MB 24 (corridors)
3. 1 x MB 20 - K2 (staircase)
4. 4 x MS 20 -03 (toilets)
5. 4 x MS 20 - K2 (bathrooms)
💯 From its dedicated research and design teams to the testing of load-bearing walls and fire resistance in its bespoke factory, Modular Build Ltd handles all elements of modular military construction to ensure the quality of the buildings meets UN and NATO standards.
Buildings with UN and NATO certifications allow us to assist in crises by providing buildings, for example, the war in Ukraine.
👇🏻 Buildings are made in accordance with STANAG 4569 Ballistic resistance regulations and have the following parameters:
- Hard metal sheets that reduce bullet pe*******on but increase the weight of the building.
- Advanced ceramic–metal composites that reduce the weight and increase the ballistic resistance.
- Advanced polyurethaning coatings combined with thinner metal composites that provide the same degree of protection as advanced composites or harder metals with less weight and lower cost.
SOUTHERN:
📲 07772 377102
📞 01271 817677
📩 [email protected]
🌐 www.modular-build.com
MIDLANDS:
📲 07443 564451
📞 01782 561110
📩 [email protected]
🌐 www.modular-build.com