KN Plumbing & Bathrooms

KN Plumbing & Bathrooms Bathroom refurbs and domestic oil heating work carried out. No job too BIG or SMALL

 ❤️ Out with the old and in with the new. Bath was removed permanently to create more room and a bigger tray put in. All...
30/07/2026

❤️
Out with the old and in with the new. Bath was removed permanently to create more room and a bigger tray put in. All pipework was put under the floor to be less of an eyesore. Lvt floor, pvc walls and ceiling. All stuff was got from CCT Bathrooms

Another one bites the dust. Must have forgotten to take before photos. Aw well. Whole bathroom was fully tiled before. C...
24/07/2026

Another one bites the dust. Must have forgotten to take before photos. Aw well. Whole bathroom was fully tiled before. Completely gutted the bathroom got plasterer in to skim the walls and fitted 1700x800 tray, wetroom screen, 3 meterwide pvc panels, back to wall toilet, 600mm vanity unit, 600x1800 towel rail and lvt flooring. All stuff was got from CCT Bathrooms

Another one bites the dust. Bathroom completed gutted and moved around a bit. This is the second bathroom in this proper...
30/06/2026

Another one bites the dust. Bathroom completed gutted and moved around a bit. This is the second bathroom in this property. Customer supplied all the goods. Freestanding bath with Freestanding tap, back to wall toilet, 600 floorstanding vanity unit and walk in shower with rainhead shower

Another one bites the dust. This is my own bathroom. We went all out on this and to be honest the photos dont do it just...
26/06/2026

Another one bites the dust. This is my own bathroom. We went all out on this and to be honest the photos dont do it justice. We went for all the brass fixtures along with the Bronze Carrera Marble meter wide pvc panels and these beaut 1200x600 tiles from TILES DIRECT. I got all the rest of the stuff from Alison in CCT BATHROOMS. I have to admit its like being in a 5 star hotels bathroom, pure luxury.

Forgot to take before photos, shower enclosure was removed as it was leaking both from the doors and as u can see the sh...
18/06/2026

Forgot to take before photos, shower enclosure was removed as it was leaking both from the doors and as u can see the shower tray is damaged. So floor was fixed, original tray was reused, new shower, doors and tile affect pvc panels fitted.

Another one bites the dust. Finished yesterday and one extremely happy customer. Bathroom gutted, all tiles removed, win...
13/05/2026

Another one bites the dust.
Finished yesterday and one extremely happy customer. Bathroom gutted, all tiles removed, window wall was soaking so had to be dried out. When it was dry it was primed and tanked. Shower moved to opposite wall. All new sanitaryware, lvt flooring and pvc panels. Customer got all her goods from CCT Bathrooms.

Another one complete. Bathroom was complete gutted back to the studwork as this was tiles over tiles. Walls reboarded an...
27/04/2026

Another one complete. Bathroom was complete gutted back to the studwork as this was tiles over tiles. Walls reboarded and plastered. 800x1100 tray installed along with 3 meterwide pvc panels, gunmetal showerdoors, chrome rain shower, lvt flooring, beautiful 600 wide vanity unit with gun metal tap and BTW toilet.

Well here we go. The customers put alot of thought into this bathroom and spared no expense. Here is the final product, ...
27/04/2026

Well here we go. The customers put alot of thought into this bathroom and spared no expense. Here is the final product, 1700x700 black slate tray along with black rain shower and wet room screen, BTW toilet, low profile wall mounted vanity unit, designer radiator, black bathroom grade laminate flooring, herring bone style board on the long wall, larisa composite boarding on the rest of the walls, and a pvc ceiling

BEFORE. LIKE AND SHARE to see the finished jobSo for the past lot of weeks I have been working on and off on this refurb...
24/04/2026

BEFORE.
LIKE AND SHARE to see the finished job

So for the past lot of weeks I have been working on and off on this refurb as no one is living in the house at present. Alot of work has went into it as the customer wanted the tiolet moved which unlucky for me as it was incased in concrete and 2 feet deep. All pipework was tracked into the floor and walls aswell, this is the kind of work that u dont see.

Out with the old and in with the new. Bathroom completely gutted, basin and radiator moved. 1500x900 rectangular tray in...
20/04/2026

Out with the old and in with the new. Bathroom completely gutted, basin and radiator moved. 1500x900 rectangular tray installed with 1200 wetroom screen and rainhead shower. New back to wall toilet, wall mounted vanity unit and new radiator. Checkout the before and after pics

Address

Ballygowan Gardens
Bangor
BT191QG

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

+447890727515

Website

Alerts

Be the first to know and let us send you an email when KN Plumbing & Bathrooms posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to KN Plumbing & Bathrooms:

Share