22/05/2026
Resin Bound Pathway Transformation
Step-by-step process from start to finish:
1. Ground preparation – area cleared, levelled and prepared ready for the new surface.
2. MOT Type 1 sub-base laid – compacted to create a strong, solid foundation.
3. Tarmac base installed – providing a smooth, durable base ready for the resin bound finish.
4. Resin bound surface laid – finished with a clean, decorative stone blend for a smart, low-maintenance look.
5. Final tidy-up – edges cleaned, drains protected and the area left neat and ready to use.
A great upgrade to this entrance area, giving it a fresh, modern and hard-wearing finish.
Call 📞
01462506039
Email 📧
[email protected]