06/02/2026
‼️Another previous job completed,remember folks get booked in as soon as possible as spaces are filling up for pricing and constructions‼️a lot of hard work went into this job and the weather held us back something shocking.excavation and removal of approximately a hundred and sixty tons of clay and waste materials before we can get started,everything had to be reinforced with concrete as there had been slight subsidence with this ground,foundation,fencing post etc just to strengthen the ground,removal of oil burner and relocated across the garden,shed taken down to gain access,new double skined oil tank replaced,new walls built for retaining purposes with small granite steps for easy access into top high raised patio,all electrics for outside sockets on top patio and wall lights new fencing around outer boundary’s,back,side and front of house,with new flagging at front made up of historic slate coloured flags the same at back and side of house and grouted with and resin based joint it for w**d control and low maintenance,and finished front off with new lawn.and coloured sand stone coloured stones,‼️job done and dusted.if you good people could LIke or SHARE to reach out to new customers that could use are help and expertise thanks .