Conquip Engineering Group

Conquip Engineering Group Conquip delivers quality and value-engineered equipment solutions to contractors around the world.

With years of working alongside water and wastewater contractors such as Cappagh Browne, we understand that speed, relia...
02/09/2026

With years of working alongside water and wastewater contractors such as Cappagh Browne, we understand that speed, reliability, consistency and adaptability are all top priorities.

Our process for making sure contractors have everything they need on complex or constrained sites means they can respond quickly, work safely and minimise disruption to local communities.

From urgent requirements to planned works, we help keep essential excavation works moving. Find out how we work with Cappagh Browne across the South of England... https://bit.ly/457JaWR

01/09/2026

To fully manage and control concrete operations, we understand contractors may see it as a full process and connected lifecycle — not multiple separate tasks.

Over the next few weeks, we’ll be focusing on how contractors can manage the full concrete process more sustainably and the role we can play in every stage. From choosing the right concrete skip for accurate pouring and capturing blowout material to reduce waste, to pH neutralising and reusing wastewater, and keeping equipment inspected and maintained.

Every stage of the concrete lifecycle is just as important as the next.
We’ve released our new three-part blog series, following the process from start to finish and explaining how each stage works:
Part 1️⃣: Managing the concrete lifecycle (from the first pour to long after washout is complete)
Part 2️⃣: An overview of concrete requirements for each type of project, environmental regulations and contractor responsibilities
Part 3️⃣: The services and support behind the equipment

Follow along to find out how we help project teams better manage the full concrete lifecycle with design-engineered equipment to support your site.

Read the blogs now >> https://bit.ly/4fXkCos

It's never just about 'the kit'... Choosing the right equipment for an important excavation site matters, but choosing t...
31/08/2026

It's never just about 'the kit'... Choosing the right equipment for an important excavation site matters, but choosing the partner that can offer a full solution matters more...

Working with us means having a partner through the assessment of what the job needs, a prompt quote, a fast temporary works design and access to a national hire fleet built for durability, reliability and long-term site use.

Our equipment is designed and manufactured in line with the British Standards Institute to support safe, compliant work below ground, helping contractors get the right solution for the job.

Our range includes:
▪ Box Systems
▪ Trench Sheets
▪ Sheet Piles
▪ Aluminium Waler Frame
▪ 300 Brace
▪ Double-Acting Manhole Brace
▪ Safety and Access Equipment

Once the hire kit arrives, we're still there for technical information, installation guidance and support until the equipment is off-hired. Our teams help contractors work safely and confidently on site.

View the Excavation Support range >> https://bit.ly/4ffWPzW

28/08/2026

Sweeping site roads and entrances needs heavy-duty, high-performing equipment.
While dedicated road sweepers are one option, our Powerbrush Forklift Sweeper, especially the pressurised version, is a fan favourite on-site, as it offers unmatched flexibility and is always there when you need it.

Plus, our Powerbrush Forklift Sweeper is supported by practical guidance designed to help site teams set up, operate and maintain the attachment with confidence, making sure it sweeps, cleans and collects exactly how it should...

The support includes:
▪ An illustrated technical user guide
▪ A step-by-step, easy-to-follow video covering pre-use checks, set-up, operation and after-use care
▪ A dedicated customer support web page featuring the video guides, troubleshooting advice, and frequently asked questions
▪ Telephone, video and on-site support from our office team and engineer call-outs, when required

Explore the Powerbrush support hub >> https://bit.ly/4wCwvau

It's 8am on-site and you’re facing yet another piece of equipment halting your operations due to a breakdown... Causing ...
27/08/2026

It's 8am on-site and you’re facing yet another piece of equipment halting your operations due to a breakdown... Causing 😡frustrating downtime, 😤expensive repairs and 😧compliance concerns.

However, regular maintenance can prevent these issues before they escalate. 😇

We're the only manufacturer in our industry providing a complete range of after-sales services.
Conquip Covered can help you long after we deliver your equipment:

📋 Inspections & Reports – We come to you to carry out LOLER & PUWER inspections throughout the year.
🔧 Repair & Refurbishment – On-site or at our workshop we can prolong the lifespan of your equipment to avoid costly replacements.
📚 Supporting Documentation – Use our clear and detailed technical user guides as documents or audio/visual guides, free and available to all.
📞 Helpdesk Support – Contact us for expert assistance via phone, online, or in person, whenever needed.
🚚 Spare Parts & Optional Extras – Delivered directly from us, often the very next day, to keep you operational.
🛠️ On-Site Training – Give your operators confidence in using our equipment correctly and safely.

WE MANUFACTURE. YOU USE. WE SERVICE.
Find out more about Conquip Covered >> https://cqegroup.com/uk/conquip-covered/

SAME WASTE. ORGANISED. CONQUIP: ADVANCING BUILD PERFORMANCEWhat if waste could be segregated at the source, rather than ...
26/08/2026

SAME WASTE. ORGANISED. CONQUIP: ADVANCING BUILD PERFORMANCE

What if waste could be segregated at the source, rather than spending more time organising it later?

That is where the Autolock Tipping Skip can make a real difference.

By positioning different skips around site for specific waste streams, teams can separate materials at the source. This helps reduce mixed waste, avoid time-consuming rehandling and keeps work areas clear.

Plus, the Autolock mechanism allows the operator to tip the skip without leaving the machine cab, streamlining operations.

A safer, simpler approach that has been improving efficient site waste handling for more than 15 years.

Want to know how this product came to life? Read the story behind the Autolock Tipping Skip >>
https://bit.ly/4puy7Al

Planned works and emergency works need different approaches and resources— but the same confidence in the kit being used...
25/08/2026

Planned works and emergency works need different approaches and resources— but the same confidence in the kit being used is the same.

Working closely with contractors in the utilities and infrastructure sectors, every week, all year round, we support excavation works on two predominant project types.

1️⃣ Planned Works
For utilities and infrastructure projects, early engagement helps teams plan before work starts.

We're there for:
Early-stage technical input for planning, bidding and equipment sspecification
In-house design packages for standard and bespoke excavation solutions
Drawings, calculations and check certificates, including CAT 3 if required
On-site support, including installation supervision and site training
Frequent visits as the project progresses through various stages

2️⃣ Emergency Works
When time is critical, the priority is getting a safe, workable solution in place quickly, with minimal disruption.

We're there for:
24/7 call-out service for urgent requirements when needed
Fast turnarounds on Temporary Works designs
Hire equipment arrives and can be off-hired on-site without delay with our reliable FORS Gold delivery service
All the safety access and ancillaries needed so the teams on the ground can get straight to work

Different workstreams. Different site pressures. The same focus on safe, compliant excavation support, backed by design, equipment and technical expertise.

Explore today >> https://bit.ly/4aWZInU

SAME CONCRETE. BETTER POUR. CONQUIP: ADVANCING BUILD PERFORMANCEKeeping concrete pouring productive means reducing downt...
24/08/2026

SAME CONCRETE. BETTER POUR. CONQUIP: ADVANCING BUILD PERFORMANCE

Keeping concrete pouring productive means reducing downtime at every stage — from filling and lifting to placement and hose changes.

Our Concrete Skips are designed to be easy to fill, straightforward to operate and precise when placing concrete into columns, walls and narrow formwork.

Our proprietary Hose Guide & Insert and discharge hose give teams control over the pour flow, helping place concrete where it is needed, precisely, with less mess and with operatives out from underneath the load.

The optional Bauer Connection allows different hose lengths to be changed using a quick-release connection, rather than removing hose clips and manually refitting the hose each time. It means less time adjusting equipment between pours and more time keeping operations moving.

From fast filling to controlled placement and quicker hose changes, it is designed to make every stage of the pour simpler and more efficient.

View our Concrete Skips FAQs to learn more >>
https://bit.ly/4yuMbxT

Reactive excavation works need a partner you can rely on... again and again.When time is critical, contractors need more...
21/08/2026

Reactive excavation works need a partner you can rely on... again and again.
When time is critical, contractors need more than equipment availability.
They need temporary works design support, reliable hire service, clear technical guidance and practical on-site support that helps teams work safely.

Our latest blog looks at how Conquip supports urgent excavation requirements for utilities contractors across the UK.

Read the blog >> https://bit.ly/4x17UMI

SAME MATERIALS. LOADED QUICKER. CONQUIP: ADVANCING BUILD PERFORMANCEWhat if load-in and load-out didn’t rely on a scaffo...
20/08/2026

SAME MATERIALS. LOADED QUICKER. CONQUIP: ADVANCING BUILD PERFORMANCE

What if load-in and load-out didn’t rely on a scaffold scheme that takes weeks to install or relocate?

As RC frame projects progress, teams need a faster, safer, more predictable way to move materials on each floor.

That challenge is why in 2006, our engineering team developed the CantiDeck— a temporary loading platform designed for really efficient load-in and load-out of the RC Frame structure.

CantiDeck helps project teams to:
>> Install or relocate the platform in as little as three hours
>> Improve crane efficiency with smoother, more predictable load cycles
>> Provides a flush surface for manoeuvring materials and equipment

Available in Fixed Flush and Super Roller models, CantiDeck has changed the efficiency game on high-rise - and shafts - projects around the world.

Read the full story behind how CantiDeck came to life >> https://bit.ly/4wfeCyx

Address

Unit 4, Waterbrook Estate
Alton
GU342UD

Opening Hours

Monday 7am - 5pm
Tuesday 7am - 5pm
Wednesday 7am - 5pm
Thursday 7am - 5pm
Friday 7am - 5pm

Telephone

+448455201101

Alerts

Be the first to know and let us send you an email when Conquip Engineering Group posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Conquip Engineering Group:

Shortcuts

Share