10/06/2026
Nice little job all boxed off in Alsager for one of the nicest people I had the pleasure of meeting sue turner
Removed all old flagged path and flags outside shed
Removed all grass and rotavated to get levels right for gravel
Installed a brindle block paving edger
Put down hardcore type 1 mot for relaying new paths and pad outside shed
Reused buff ripping and buff 450x450 flags that client already had to make new paths and pad
Removed all plants in existing flower bed bar apple tree ready for turf
Levelled off ground and topped up with top soil
Laid 40 sqm of turf
Made a sleeper flower bed ready for client to grow her veg
Cut back over grown trees and bushes ready to install new fence line
Installed concrete posts gravel boards and vertical slated fence panels painted by client
Laid down double layer woven thick w**d membrane
Put down 6 ton of 20mm golden gravel over remaining area
Installed new brick and flag step for easier access to gravel area of garden
All cleaned down
2 and a half days all done and dusted ready for our massive project next week
SJS BUILDING SUPPLIES AS ALWAYS
POTTERIES WASTE