24/01/2026
Over 80mtrs of new foul drainage installed recently into an existing system. To achieve proper drainage falls we had to excavate up to 1.1 meters at the inlet side. We installed a short steep section before the long run to get the foul from one elevation to the other, having this it will eliminate solids being left behind. Inspection chambers added either end of the section and one put in at 50 meters away from the nearest inspection chamber to keep to building regulations, this ensures if ever a blockage it can be easily rodded or have a survey carried out in the future. Pipe laid on and encased in 100mm of pea grit to avoid movement over the years and keep proper falls. ๐งโ
๐07706 325003
๐ง[email protected]