08/29/2026
This is the second significant HDPE pipe installation performed by Dean forces within a two-week period. This level of production would not be possible without the 24/7 efforts of our crews and the schedule-driven guidance of Project Manager, Justin Soudant.
The project is located in Georgina, Ontario which is located on Lake Simcoe.
This phase of the Region of York’s Georgina Water Treatment Plant upgrades consisted of 1400 lineal meters of twinned 10” diameter HDPE casing pipes ballasted with 332 mated concrete collars and installed in a dredged trench which is shared with the previously installed outfall pipe.
Turbidity levels during dredging were monitored and reported to the engineer and Owner in real-time with no exceedances experienced. Site documentation was cloud-based, with access provided to all relevant parties.
Water depths at the installation ranged from 4m at the connection to the onshore shaft to 16m at the intake structure. All diving on the site was performed by Dean’s in-house dive teams, who have become a huge competitive advantage in the six months they have been part of the Dean team.
The connection to the onshore shaft was accomplished using a stainless-steel casing pipe installed through a hole which was core-drilled through approximately 1m of concrete with the drilling completed in-the-wet. The pipe-to-concrete anulus was sealed with grout to achieve water-tightness.
The site had an extremely limited lay-down area, as evidenced in the accompanying pictures.
The backfilling of the trench and accessory attachment at the intake will be completed shortly.
Outstanding work by the Dean crews.