HOT TAPPING UNDERWAY
4 Ć 8ā³ LIVE CONNECTIONS
New Branch Connections ⢠Live System
WellFab in the field completing four 8ā³ hot taps to create new branch connections on an operational chilled-water system.
With the existing system remaining in service, WellFabās field team is executing each connection through carefully planned hot tapping operations, allowing the new branches to be introduced without a system shutdown.
4 Ć 8ā³ Live Connections.
No Shutdown. Continued Operation.
Engineering Without Interruption.