10/02/2026
We were pleased to receive occupancy for the Golden Ears Elementary Prefabricated Addition this month.
The project uses prefabricated wall panels, significantly reducing the time required to complete the building envelope. The addition was carefully integrated with the existing school to minimize its impact on the site.
The two-storey addition includes eight classrooms, four per floor, connected by a central corridor and serviced by an elevator. Two exterior galvanized steel stairs provide additional access and increased durability while reducing long-term maintenance requirements.
Swipe through for more!