02/09/2024
Engineered hardwood flood repair last week in downtown Vancouver, B.C.
After removing the affected boards, we found the subfloor to be quite damp for reinstall, so we placed some fans and heaters and came back the next day for installation.
Luckily the homeowners had juuust enough planks for the repair, which is why it’s always a good idea to hang on to the leftover planks after a flooring project; you never know when you might need them.
If you’re looking for a reputable, quality flooring installation crew, reach out for a quote via DM or @ 604-600-7919 to price out your project 🇨🇦