Going through the archives, we slung a tonne of  hardware last year, including this renovated barn. Hopefully we’ll get ...
02/06/2026

Going through the archives, we slung a tonne of hardware last year, including this renovated barn. Hopefully we’ll get to do more in 2026

Hung a few doors, and wrapped up the trim on this commercial renovation, ready for paint!
02/20/2025

Hung a few doors, and wrapped up the trim on this commercial renovation, ready for paint!

Wrapped up a little accessibility ramp, 34’ feet of ramp, 22’ feet of landings, should help the homeowner get around a l...
11/19/2024

Wrapped up a little accessibility ramp, 34’ feet of ramp, 22’ feet of landings, should help the homeowner get around a little better.

More framing on an accessory building on the peninsula balloon framed roof deck for some design flexibility on the fly. ...
10/13/2024

More framing on an accessory building on the peninsula balloon framed roof deck for some design flexibility on the fly. Parapet to come.

All the windows in, ceiling strapped, epoxy on the floor. Waiting on doors and strapping the second storey to button thi...
10/03/2024

All the windows in, ceiling strapped, epoxy on the floor. Waiting on doors and strapping the second storey to button this one up.

A few finished photos (swipe see the before) of the  new Truro location, this was a fun one, all the new cabinets, millw...
09/03/2024

A few finished photos (swipe see the before) of the new Truro location, this was a fun one, all the new cabinets, millwork and benches were done in house, reframed, made compliant for food service and accessibility standards.

Go check it out, they serve great coffee and baked goods!

The 30x40 is moving along, looking forward to getting trusses and roof on in the near future.
08/18/2024

The 30x40 is moving along, looking forward to getting trusses and roof on in the near future.

40’ of wall, framed blocked and sheeted on the floor. Just 100’ of wall left here before it’s time to start slinging tru...
08/07/2024

40’ of wall, framed blocked and sheeted on the floor. Just 100’ of wall left here before it’s time to start slinging trusses.

Lots of progress at the 30x40 in Valley, 1’ centres and so weird steel tie ins. We should be ready for the floor system ...
06/28/2024

Lots of progress at the 30x40 in Valley, 1’ centres and so weird steel tie ins. We should be ready for the floor system and trusses next week.

Done ✅ 20x15 covered deck, with a 12x12 uncovered with privacy wall
06/01/2024

Done ✅ 20x15 covered deck, with a 12x12 uncovered with privacy wall

WIP: we were really close to 4 days, steel gets here in a few days and we’ll button it up then.
05/21/2024

WIP: we were really close to 4 days, steel gets here in a few days and we’ll button it up then.

Finished photos from 311, .strands new location, thanks Lindsay and Jeremy for trusting me to execute your vision.
05/07/2024

Finished photos from 311, .strands new location, thanks Lindsay and Jeremy for trusting me to execute your vision.

Address

Truro, NS

Website

Alerts

Be the first to know and let us send you an email when Cruz Custom Builds posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Cruz Custom Builds:

Featured

Share