BVM Homes

Call Directions Website

BVM Homes Your GTA Family Home Builder. Providing comprehensive pre-construction planning to protect your biggest investment into your home.

Learn more about our constructible design guarantee and design & feasibility sprint offer! Serving the Greater Toronto Area since 1997, Vince Meagher, Owner of BVM Contracting has built a reputation on quality, trust and performance. We have a committed group of Sub-Contractors that we work with at every stage of the project to ensure we build your dreams into a reality. Having completedly renovated 8 custom designed homes in six years as well as managing numerous renovations; from inception to completion, we are the contractor who turns the key over to you. Your job is to open the door to your newly built or renovated home. All quotations are free and after our initial site meeting, we provide you with a working budget until drawings can be finalized. Once the plans are final, a comprehensive breakdown of the job costs will be submitted for your review.

There is a moment we watch homeowners go quiet. They have bought the lot, they have a budget they feel good about, and t...
10/10/2026

There is a moment we watch homeowners go quiet. They have bought the lot, they have a budget they feel good about, and then someone says the word servicing.

A Toronto lot that needs a new water service and a new sewer connection carries $20,603.22 in published City fees before anyone digs on the property. That is the City, not the builder, and none of it is negotiable.

Two things catch people out. The first is thinking you can shop it. You cannot, because servicing is costed by the utility providers themselves, so there is no second quote to go get. The second is the storm connection people budget for and do not need. Under Chapter 681 a storm connection cannot be made to the City storm or combined sewer, so stormwater is managed on your own lot and a house gets one sewer connection, not two.

The part you actually control is the private side, from the property line into your basement, which runs $600 to $700 per metre depending on length, supply size and depth. And there is one real saving available: ask Toronto Water whether your existing service can be reused. If it is already 3/4 or 1 inch copper, that is $367.13 instead of $5,884.44.

We put all of this into a preliminary budget before the drawings are finished, so the number is in front of you while you can still do something about it.

Full breakdown, every 2026 fee and the timing: https://www.bvmhomes.com/blog/lot-servicing-costs-toronto

Comment PLAN and we will message you how to find out what your lot allows and what it would cost to build.

12 months. That is the honest minimum from starting design to moving back in on a Toronto addition, and the number famil...
10/10/2026

12 months. That is the honest minimum from starting design to moving back in on a Toronto addition, and the number families push back on most.

A permit alone takes six months here, nine with a Committee of Adjustment hearing, and over a year once Urban Forestry, the TRCA or heritage are involved. Then six months of construction, which for a second storey means six months out of the house and roughly $21,000 to $24,000 in rent on top of the build.

If a builder promises a permit in a season, ask which step they skipped. We wrote up the three situations where we tell a family not to build yet, and the timeline is one of them: https://www.bvmhomes.com/blog/when-a-home-addition-is-the-wrong-call

This week on BVM sites.North York: the second storey is framed and sheathed, and roofing started on the top level this w...
10/09/2026

This week on BVM sites.

North York: the second storey is framed and sheathed, and roofing started on the top level this week with the flat roof membrane. Next is the connection to the lower roof, so the house is weather tight before the rain.

Also in North York: the plumbing rough-in is under way. Drains and water supply lines now run through the new framed walls.

On a third site, the interior walls are framed out and the ductwork is running to the new rooms.

A roof going on, pipes going in, rooms taking shape. Three sites, one week.

Following along beats wondering: https://www.bvmhomes.com

The same front entrance, during and after.The finished porch gets the compliments. The preparation earns them. Every lin...
10/08/2026

The same front entrance, during and after.

The finished porch gets the compliments. The preparation earns them. Every line you see in the finished photo was decided long before the finishes arrived, which is why the stone, the timber ceiling and the black trim land the way they do.

Great entrances are not decorated into existence. They are planned into existence. That is the part of the job nobody photographs, so here it is.

More of our work: https://www.bvmhomes.com

Three times we tell a Toronto family not to build the addition: the budget gap, the zoning fight, and a timeline shorter...
10/07/2026

Three times we tell a Toronto family not to build the addition: the budget gap, the zoning fight, and a timeline shorter than 12 months. The Birchmount Road family heard "not on this house" from us in 2024, shopped with our numbers in hand, and we built their extension on the next one. Zoning saying no is normal here, and some type of addition works on about 95% of the lots we review. The wrong call is the variance you cannot wait 12 to 18 months on, or the permit nobody gets in a season. On Kimberley Avenue in The Beach we skipped the addition entirely and found the third bedroom inside the house. Full article: https://www.bvmhomes.com/blog/when-a-home-addition-is-the-wrong-call. Comment PLAN and we will message you how to find out what your lot allows.

"I just want to get a feel for it first." We hear it a lot, and it usually backfires.The scouting call sets the budget e...
10/06/2026

"I just want to get a feel for it first." We hear it a lot, and it usually backfires.

The scouting call sets the budget expectation, the scope and the impression of the builder. The second partner inherits all three without having heard any of it. Then the questions they would have asked get relayed, shorter, a few days later.

If you two have different priorities for the project, bring the disagreement to the call. Up versus out, how much the lot allows, what the number really is: we can answer most of it in the room, and it is much faster than arguing about a guess for a month.

The full article, including the family where one person steering worked well:
https://www.bvmhomes.com/blog/both-partners-on-the-discovery-call

Comment GUIDE and we will message you the link to our cost guide. It has a live East York addition budget in it, line by line.

"A project this size means a construction mortgage." It usually does not.And if you do use one, know this before you sig...
10/05/2026

"A project this size means a construction mortgage." It usually does not.

And if you do use one, know this before you sign. We bill on milestones. Your lender releases money only after an inspection confirms the work is finished. The work has to be paid for before that, and lenders expect you to carry the first 25 to 40 percent of the construction value yourself. On a $600,000 addition, that arithmetic is $150,000 to $240,000 of your own money going in before the draw cycle takes over.

That is not a lender being difficult. It is what keeps the project liquid between payments, and it keeps your builder out of the financing business.
https://www.bvmhomes.com/blog/how-to-pay-for-a-home-addition-toronto

Comment GUIDE and we will message you the link to our cost guide. It has a live East York addition budget in it, line by line.

Renovate or move? Most Toronto families run this math with $100,000 missing.Here's what the listing-vs-listing compariso...
10/05/2026

Renovate or move? Most Toronto families run this math with $100,000 missing.

Here's what the listing-vs-listing comparison leaves out: commission on a $1.5M sale is $60,000 to $75,000. Toronto charges land transfer tax twice, about $57,000 on a $1.8M purchase. Legal, moving, and bridge financing add $10,000 to $20,000. All of it vanishes at closing and builds zero equity.

On the other side, adding 600 to 800 square feet typically runs $400,000 to $750,000, and sometimes a smart interior renovation solves the problem for less.

Swipe through the real ledger, then read the full article: https://www.bvmhomes.com/blog/renovate-or-move-toronto-real-math

Comment GUIDE and we will message you the link to our cost guide. It has a live East York addition budget in it, line by line.

"Another builder said we could stay in the house."We hear it a lot, and the answer is still no. Once the roof comes off,...
10/04/2026

"Another builder said we could stay in the house."

We hear it a lot, and the answer is still no. Once the roof comes off, services go off at points, the kitchen and bathrooms are out for stretches, and trades are working on every floor. It is unsafe, it is very hard with kids, and a family on site every day slows the job down and makes it worse.

A builder who says yes to everything at the first meeting costs themselves nothing by saying it. The cost shows up once the roof is off, and it lands on you.

The full list of who we are not the right builder for:
https://www.bvmhomes.com/blog/who-we-are-not-the-right-builder-for

Comment GUIDE and we will message you the link to our cost guide. It has a live East York addition budget in it, line by line.

Address

80 Barbados Boulevard
Toronto, ON
M1J1K9

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

+16474014663

Alerts

Be the first to know and let us send you an email when BVM Homes posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share