Maple Leaf Construction

Maple Leaf Construction Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Maple Leaf Construction, Contractor, 44 Crockford Boulevard, Toronto, ON.

05/27/2024

We had to find a way to protect this heritage window!

Can you guess why we had to build this special protection around the window at our current Rosedale project? Fun fact: there are no fasteners in the window framing to preserve its heritage.

416.219.5182 - MapleLeafGC.ca - [email protected]

05/24/2024

Digging deep near the Danforth!

Excavate, dispose, form and pour. These are the days of our lives...

416.219.5182 - MapleLeafGC.ca - [email protected]

05/20/2024

As the truck and pump make their final adjustments, it's game time! All hands are on deck and senses are heightened to ensure a smooth pour.

416.219.5182 - MapleLeafGC.ca - [email protected]

05/16/2024

General Contractors: Do you have subs or do you have trade partners?

Here we collaborated with the general contractor and landscaper's crew to ensure details were met for this snowmelt base. Achieving greatness together, one collaborative effort at a time.

416.219.5182 - MapleLeafGC.ca - [email protected]

We have received multiple calls similar to this one. It is not affiliated with us in any way. 🚨Beware of door knockers. ...
05/08/2024

We have received multiple calls similar to this one. It is not affiliated with us in any way. 🚨

Beware of door knockers. Never agree to work/give deposits on the spot! Check out our blog post: Door-to-Door Contractors: How to Spot a Scam. Link in bio.

Steel Ribbing detail completed for 10ft ceilings. πŸ’ͺ🏼
03/17/2023

Steel Ribbing detail completed for 10ft ceilings. πŸ’ͺ🏼

Big boots on a jacked up wall. We worked closely with our client and the engineer to design a pin that would accomodate ...
02/17/2023

Big boots on a jacked up wall.

We worked closely with our client and the engineer to design a pin that would accomodate for their platform framing plan.

Thankful for our team for great forms and our Oztec vi****or to keep the concrete flowing into those massive boots!

Final pour at this six stage double lift for our good friends . Keep an eye on this one as it's going to be an amazing a...
02/10/2023

Final pour at this six stage double lift for our good friends .

Keep an eye on this one as it's going to be an amazing addition when it's all said an done.

Happy to have helped and played our part and thankful the weather held up during the project.

Hand finished with zero tolerance. Ready to be sealed and polished. πŸ˜˜πŸ‘ŒπŸ½Looking forward to seeing how this turns out for ...
01/27/2023

Hand finished with zero tolerance. Ready to be sealed and polished. πŸ˜˜πŸ‘ŒπŸ½

Looking forward to seeing how this turns out for the client. Going to make a great space.

Sump pump install for a great client with ground water challenges over the last few weeks. They invested in an exterior ...
01/26/2023

Sump pump install for a great client with ground water challenges over the last few weeks.

They invested in an exterior waterproofing but a sump pump was not installed as part of that.

With heavy rains and freeze thaw cycles there was a build up of hydrostatic pressure and we were engaged to install a sump pit, tying it into the exterior weeper.

The team did a great job with the installation to allow the client to still utilize the storage space!

Bench details from a recent project. Alot of rebar went into this detail. Large retaining bench to create an entrance wa...
01/21/2023

Bench details from a recent project.

Alot of rebar went into this detail. Large retaining bench to create an entrance way into a 10ft clear space that will be used as a golf simulator. ⛳️

Alot to consider when doing a detail like this, plumbing passing through and maintaining a contious waterproof detail.

The guys did a great job πŸ’ͺ🏼

Another project tucked in tight for the holiday break. Second stage poured at our double lift. We will be back in the ne...
12/23/2022

Another project tucked in tight for the holiday break. Second stage poured at our double lift. We will be back in the new year for the 3rd stage before we go down another 3 ft and complete the second lift before we hand it over to for the foubdation work on an amazing 3000 sq ft addition in Georgetown!

Address

44 Crockford Boulevard
Toronto, ON
M1R3C3

Alerts

Be the first to know and let us send you an email when Maple Leaf Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Maple Leaf Construction:

Share

Category