05/06/2024
We worked on this project for a very very long time. Showed up to do two simple bathroom updates. Just gut and redo the finishes. When we started gutting we found mould and naturally I wanted to figure out why and how. So with the consent of the worried home owner we dug into it. The ceiling had no V***r barrier, and inadequate insulation. Causing condensation to happen when hot and cold air meet. Boom! Meet your enemy mould. We ripped everything down. Had roofers come and replace the rotten plywood above the bathroom area and re-shingle. Then we had spray foam done. Ended up making the two bathrooms into this amazing spa like ensuite! I have a tonne of content on this and hopefully I find a way to share it all. The old cottage had some pretty uneven floors, which we were able to use to our advantage and get a nice curbless shower out of the deal. We also have ditra heat in the floors and a heated bench on this one 😬 will be sure to share lots more over the next bit on how this project started and finished! Hope you enjoyed and thanks for looking.