Nuframe Group

Directions Website

Nuframe Group Nuframe Group is a multi-faceted wood framing and concrete forming construction company.

Prefabrication has a reputation for meaning "one size fits all," but that's not how we build.Every panel we produce is e...
10/05/2026

Prefabrication has a reputation for meaning "one size fits all," but that's not how we build.

Every panel we produce is engineered to match the specific architectural requirements of your project, whether that's a standard layout or a more complex, custom design. Precision manufacturing doesn't mean sacrificing flexibility, it means bringing the same accuracy to whatever your project calls for.

Custom doesn't have to mean complicated. It just means it's built right.

Permitting and inspections can be one of the most unpredictable parts of any project, especially when documentation is i...
09/29/2026

Permitting and inspections can be one of the most unpredictable parts of any project, especially when documentation is inconsistent across multiple trades and suppliers.

Because our panels are built to standardized specifications in a controlled facility, every piece comes with consistent, documented precision from the start. That means less back-and-forth with building officials, and fewer surprises during inspection.

It's one more way we help keep your project moving, not just on-site, but through every stage of approval.

Progress continues at The Colton Phase 2 in Langley.Framing and wall panel installation are well underway across this si...
09/25/2026

Progress continues at The Colton Phase 2 in Langley.

Framing and wall panel installation are well underway across this six-storey building, with balconies, window openings, and sheathing all coming together. Once complete, this phase will add to the 371 homes The Colton is bringing to the community, including 95 adaptable units designed with accessibility in mind.

It's great to see this next phase taking shape.

📸: Tannin Developments

The BCIT: British Columbia Institute of Technology Robert Bosa Carpentry Pavilion has come a long way since that first m...
09/22/2026

The BCIT: British Columbia Institute of Technology Robert Bosa Carpentry Pavilion has come a long way since that first mass timber delivery.

Our team is now installing the exterior walls, the final major milestone before this two-storey building is complete. Once finished, the Pavilion will house BCIT's new Mass Timber Construction training program, combining a mass timber frame with light wood-frame interior walls.

We're proud to have been part of bringing this facility to life, one built to train the next generation of BC's tradespeople.

In construction, time isn't just a schedule, it's money. Every extra week on-site is a week of delayed occupancy, delaye...
09/10/2026

In construction, time isn't just a schedule, it's money. Every extra week on-site is a week of delayed occupancy, delayed leasing, or a delayed return on investment.

Our prefabrication process is built for speed without cutting corners. Panels arrive ready to install, cutting down the time your project spends under construction, and getting you to occupancy faster.

Because the sooner your building is ready, the sooner it starts working for you.

Every hour of work happening on-site is an hour of noise, traffic, and disruption for the people around it, whether that...
09/03/2026

Every hour of work happening on-site is an hour of noise, traffic, and disruption for the people around it, whether that's a neighborhood, a business, or a busy campus.

Because so much of our process happens off-site at our Chilliwack facility, less of that disruption ever reaches your job site. Panels arrive ready to install, which means less time, less noise, and less impact on the community surrounding your project.

It's a quieter way to build, without slowing anything down.

The roof is going on at BCIT: British Columbia Institute of Technology's Robert Bosa Carpentry Pavilion in Burnaby.With ...
08/27/2026

The roof is going on at BCIT: British Columbia Institute of Technology's Robert Bosa Carpentry Pavilion in Burnaby.

With the mass timber structure and second level now in place, our team has moved on to enclosing the building, bringing this two-storey facility one step closer to complete. Once finished, the Pavilion will house BCIT's new Mass Timber Construction training program, combining a mass timber frame with light wood-frame interior walls.

It's a great milestone to see, and there's still more to come as the project continues to take shape.

08/25/2026

Piece by piece, the BCIT: British Columbia Institute of Technology Robert Bosa Carpentry Pavilion is taking shape 🎥

Check out our team installing the site's roof in Burnaby.

A delayed schedule is one of the biggest risks on any construction project, and it's rarely caused by a single issue. It...
08/19/2026

A delayed schedule is one of the biggest risks on any construction project, and it's rarely caused by a single issue. It's usually a chain reaction, one missed handoff between subcontractors throwing off everything downstream.

At NuFrame, our shipping, crews, and prefabrication all operate in-house. That means we're not waiting on a third party to deliver materials or show up on-site. Our schedule is our own to manage, start to finish.

The result is a project timeline you can actually count on.

08/14/2026

Level two, underway.

Take a look as our team installs the second level at BCIT: British Columbia Institute of Technology's Robert Bosa Carpentry Pavilion in Burnaby.

Address

3237 190th Street, #108
Surrey, BC
V3S0L5

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Alerts

Be the first to know and let us send you an email when Nuframe Group posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share