09/11/2026
π§ MECHANICAL ROOM ROUGH-IN | BUILT WITH A PLAN
A look at our mechanical room rough-in work before final finishing.
β
Separate shut-off valves provided for each bathroom
β
Dedicated hot-water recirculation line
β
Separate supply & return lines for boiler radiator heating
β
Individual supply & return piping for proper system control
β
Organized layout designed for easy servicing and future maintenance
This is the rough-in stage. Final connections, equipment setup and finishing will follow as the project progresses.
π Surrey β’ Vancouver β’ Lower Mainland, BC
BL Plumbing & Heating Ltd.
Plumbing β’ Heating β’ Boilers β’ Radiant β’ HVAC