06/04/2026
One of three bathroom projects for some great clients in Carp!
This en-suite was a full gut, down to the studs. We removed a built in tub, took down a wall between the toilet and the main bathroom, and created a crisp and clean open space.
In floor heat, large format wall and floor tiles, heated towel rack, and all quality fixtures and finishes really has this space feeling luxurious and ready for years of enjoyment.
A big thanks to for tailoring the electrical requirements perfectly to the clients needs.