On The Head General Contracting

On The Head General Contracting Renovation or new construction I can help

03/10/2026

Pretty cool what they are coming out with these days

02/27/2026
Thank you Signature Support Services for another project and thank you to the tenants of the group home for their patien...
02/18/2026

Thank you Signature Support Services for another project and thank you to the tenants of the group home for their patience.
I forgot before photos but snapped some mid job and finished ones.

We built a bedroom in the basement after it had flooded.

The upstairs bathroom was split into 2 areas with a 3rd door in the middle, we removed 2 doors and created one entry point, removed 2 vanities and replaced with a larger vanity, updated the flooring to new lino, removed old surround/tub and replaced with new one, and gave the whole room a new paint job.

We also installed new subfloor and flooring in the rear entry making it easier for wheelchair mobility access.

Thank you Sexsmith and District Museum Society for continuing to allow us to work with you to improve the train station....
08/13/2025

Thank you Sexsmith and District Museum Society for continuing to allow us to work with you to improve the train station.

We added stairs in May to create access to the newly added dining car.

I would like to thank the Hythe Motor Speedway for the opportunity to work on the large grand stands.Like all jobs this ...
08/10/2025

I would like to thank the Hythe Motor Speedway for the opportunity to work on the large grand stands.

Like all jobs this one had unique obstacles to overcome. The stands being built in 2 stages over 2 decades and being moved so, nothing quite lined up as it once had.

The original stands had 2 sets of narrow stairs about 2 feet wide both in the middle section, we added stairs along the edges and 3 sets in the middle with hand rails all 3 feet wide. A long time attendee mentioned while making the estimate that it was difficult at times to get into different seating spots with only 2 sets of stairs.

We made the camera crews platform safer by adding hand railing, also creating a barrier so children couldn't climb onto the tower roof anymore.

We closed the sides and backside of the stands with tin, which will reduce wind (which we discovered Hythe has no shortage of), as well as some storage for such things as the garbage cans that would roll away at times with the wind 😂 😆

Thank you DJC Services Ltd for helping out with the tear out and some of the rebuild.
Thank you JLB Contracting Ltd for building the hand rails.
Thank you Nelson Lumber Grande Prairie for the amazing lumber and tin pricing as always.

Address

Sexsmith, AB
T0H3C0

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

+17808315942

Alerts

Be the first to know and let us send you an email when On The Head General Contracting posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share