07/28/2026
With the front porch epoxied, we were able to return and complete the finishes, railing and fabricate remaining trims to complete the exterior - the house now matches the existing shop we’d previously built and is looking great.
With sidewalks being poured shortly, we will be back to install the final rail for the pre-fabricated stairs.
Kiern Lack-Shane
John Pelss
Brandon Wettlaufer
Wellesley & Linwood Home Hardware
Curty's Concrete
Curtis Costello