10/14/2026
Exciting progress in Niagara Falls!
Read The Full Post here 👉
https://theinnovativegroup.ca/project_updates/niagara-falls-home-addition-helical-piers-foundation-update/
We are officially underway on a new 500-square-foot rear home addition designed as an accessible in-law suite for our clients' parents. This single-story space will feature a dedicated bedroom, a barrier-free shower, and a kitchenette.
Today’s milestone update focuses on the foundation: the installation of heavy-duty helical piers. Because the addition sits low to the ground (about 18" off grade at its highest point) and supports a heavy floor load carried by 3-ply LVL engineered beams, standard adjustable top piers couldn't handle the weight requirement.
Instead, each pier shaft was driven deep to proper torque, cut to exact laser elevation, and finished with heavy steel top plates welded directly on site. This custom detail ensures complete structural rigidity and zero long-term settlement.
With the foundation locked in place, we are rolling straight into setting the main LVL beams and framing the engineered wood I-joist floor system.
Stay tuned as this multi-generational build comes together!