06/27/2025
Winter rip rap project to protect your shoreline from erosion. Started by clearing the snow and taking an excavator down to rip the ice that had built up along the shoreline to find the dry lake bed to build on. Larger stones were used as a base with 3-8” stones placed in throughout to help lock in and secure stones.