06/08/2026
Summer time means deck season and this year we are taking that to a whole different level with 48 decks to be repaired and/or replaced. Here we erected various scaffolds around the existing decks, after inspecting all of them via man lift. The scaffolds are designed to both carry the weight of the roof above and allow us access to complete the new decks. Clients were kept safe by covering the door frames and hand railing from the outside while the work was commencing. Then its the re frame and dismantle. As always a big thanks to Kelson Group for their continued faith in us and to our awesome crew as well. Could never do this without ya. Cheers and onto the next ....of many decks 😁.