Three Pole Construction Three Pole Construction is a local indigenous-owned construction company servicing the North Island

Work from the past couple weeks, built some walls to enclose an area at the Nimpkish Hatchery. There is an exterior door...
10/08/2026

Work from the past couple weeks, built some walls to enclose an area at the Nimpkish Hatchery. There is an exterior door and a custom built barn door.

Next is to install pvc panelling on the interior side of the enclosure. Not sure what is decided for the exterior at this point in time, however its protected for the time being. We love working out by the river 😎

Tansi, We're almost at the completion point of this addition. Theres still some interior work to be done later this week...
09/28/2026

Tansi,

We're almost at the completion point of this addition. Theres still some interior work to be done later this week, but we are happy with the progress so far.

We started this project with a vision and a budget, we used the right guys and resources available, and hit the nail on the head. This was definitely a challenging job in terms of practice and ex*****on, we made alot of on site changes and thought of clever solutions to some interesting problems. Alot of carpenters know that renovations never go as planned, but we ended up steering the boat through this one as experience played a crucial role.

On to the next, there are some fun jobs lined up for the rest of fall and headed into winter. Aho!

This addition is coming along great. The client and I made an on site decision to go with a vaulted ceiling instead of 8...
09/09/2026

This addition is coming along great. The client and I made an on site decision to go with a vaulted ceiling instead of 8 ft high standard walls. A little more framing, but it makes all the difference in a room πŸ™ŒπŸ™Œ Shout out to the crew whos been helping this project along, local help is always appreciated πŸ‘ πŸ’

House addition progress, roof is on and protected!Yesterday we started with exterior walls up, once we seen the weather ...
09/02/2026

House addition progress, roof is on and protected!

Yesterday we started with exterior walls up, once we seen the weather report it was a mad dash to cut the rafters, install the ridge, sheath the roof, and wrap it with some roofing underlay. 🫠🫠🫠 feeling it today

200 linear ft of good neighbour fence completed for the Amlilas Daycare in Alert Bay. We also removed the old play struc...
08/23/2026

200 linear ft of good neighbour fence completed for the Amlilas Daycare in Alert Bay. We also removed the old play structure and donated it to the Alert Bay Farm for the goats 🐐

Thank you to the crew and everyone who helped out with this project!

On to the next

We have been getting our fencing in this month.One job was doing metal prefab panels in Port Hardy for a great guy!Next ...
08/15/2026

We have been getting our fencing in this month.
One job was doing metal prefab panels in Port Hardy for a great guy!

Next job is completing about 200 L/ft of 4' high pressure treated fence in Alert Bay at the Amlilas Daycare. This should be completed early this week.

After that we are moving onto a home addition for another hard working client on Alti Rd in Alert Bay. The summer is flying by, cant wait to showcase our work!

More educated indigenous youth, follow your dreams, and follow a trade. We need you out there! Ive been doing carpentry ...
08/15/2026

More educated indigenous youth, follow your dreams, and follow a trade. We need you out there! Ive been doing carpentry since 2009, its hard work but fulfilling nonetheless.

We push our youth to get educated, and follow through with their apprenticeship.
3 students have gone through trade school using our sponsorship and credentials. We hope to make more ticketed carpenters available out there as the business grows. Slow and steady 😁

Dig day!!
08/06/2026

Dig day!!

Another day another deck, this one is at sea level on a high tide.Next up is a bunk house, we did some site prep and lay...
07/10/2026

Another day another deck, this one is at sea level on a high tide.

Next up is a bunk house, we did some site prep and layout for an A frame style bunk cabin, until next time!

We added 2 more 4x12x20' beams to the deck, 2x6 decking, built a set of safe, wide-tread stairs, and installed some temp...
06/20/2026

We added 2 more 4x12x20' beams to the deck, 2x6 decking, built a set of safe, wide-tread stairs, and installed some temporary safety rails before we left.

When we come back we will put together some beautiful handrails out of 4x4s, fix up some old stairs, and build another smaller deck closer to the water.

What an amazing time we had, it was good for the soul. Thank you for all your hard work and keeping the tunes fresh, vibes positive, and coffee brewing all day for us Leo Dort

Address

Port Hardy, BC

Alerts

Be the first to know and let us send you an email when Three Pole Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Three Pole Construction:

Shortcuts

Share