STUMP GRINDING ( measured at the base of the stump/where it meets the ground), cost will vary depending on , soil/tree type, depth the customer wishes to grind out (level with ground or up to 6” below grade), stage of rot of the stump/root system is at, proximity to delicate yard items, if you desire the wood chips be removed and top soil place in the hole, and size of root system. A multiple stum
p discount may be applied depending on the size of job.Approximate rates: 0-6” 50.00, 6-12” 100.00, 12-18” 150.00, 18-24” 200.00, 24”-and larger can be discussed. SNOW REMOVAL: (Petawawa area only)I use a snow pusher with rubber cutting edges (to minimize any laneway damage) as well as a snow blower to clear larger amounts of snow.Suburban driveway (20’X40’ or smaller 25-30.00). Also able to give seasonal rates (1December thru 31March). Discounts may apply for multiple homes in close proximity. Longer or larger lanes can be quoted upon request. 1” snow fall minimum (unless otherwise discussed). Maximum 15 clients per season at this time due to company size (quality over quantity).BACKHOE: (2 hr minimum) able to reach a maximum of 6’ down. Light digging or movement of material- 60 per hourTrenching (60-80 per hour or “by the job” quote) (septic field, conduit trench, or drainage ditch as an example).YARD WORK (2 hr minimum) movement of earth, spreading soil, and any other tasks a subcompact tractor is suited for.Rates start at 50.00 per hourDRIVEWAY MAINTENANCE (Gravel/dirt) (2hr minimum) utilizing a 60” box blade and land plane to remove potholes and rejuvenate your laneway. Rates start at 60.00 per hour or “by the job quote”.GRAPPLE WORK: coming soon July/ August 21 time framePOST HOLE DIGGING: coming soon May 21 time frameDue to safety and insurance i must mark the area to be worked on and submit all proper documentation to Ontario one call/Call before you dig. This is a free service for the client but does take from 5-7 business days to complete. This applies any time my equipment breaks ground (Digging, yard scrapes, Stump grinding, Posthole digs, Deeper box blade/land plane work, trenching, etc)Float fee starts at 100.00 for equipment trailer and 150.00 for use of hydraulic dump trailer. Float fee increases the farther out the job is from Petawawa as well as current fuel price fluctuation. All prices do not include taxes. Unfortunately we do not travel to Quebec at this time.