Woodwork by Kevin

Call Directions Website Contact the business

Woodwork by Kevin I provide marine woodworking services such as restorations,re-finishing,dry rot repair and custom in

Final sanding, some prep work and finally stain .
10/14/2026

Final sanding, some prep work and finally stain .

Flipped right side up and working on repairs to the inside and deck .Sanded to 80 grit .
10/08/2026

Flipped right side up and working on repairs to the inside and deck .
Sanded to 80 grit .

Monday we flip it over and continue with the decks and inside
10/03/2026

Monday we flip it over and continue with the decks and inside

A new project at the shop , Buy it now and restore yourself or I’ll restore it . 1962 Fontaine 17’ with 1963 40 hp Johns...
10/02/2026

A new project at the shop ,
Buy it now and restore yourself or I’ll restore it . 1962 Fontaine 17’ with 1963 40 hp Johnson .

Continuing on with this project the bottom is painted and the hull side painted . Next water line then flip over
10/01/2026

Continuing on with this project the bottom is painted and the hull side painted . Next water line then flip over

Moving along with this project.Refastened the bottom , faired sanded and painted the bottom . Made a solid mahogany plan...
09/26/2026

Moving along with this project.
Refastened the bottom , faired sanded and painted the bottom . Made a solid mahogany planked transom and a small test area of the hull sides colour

A new project in the shop , refinishing, some fiberglass repair some refastening  of the bottom .
09/16/2026

A new project in the shop , refinishing, some fiberglass repair some refastening of the bottom .

Some teak Taft rail refinishing and blending using epoxy and varnish
09/14/2026

Some teak Taft rail refinishing and blending using epoxy and varnish

The Grenell project moves along with installing the 1/4” plywood on the front of the bottom . Later we will laminate 1/4...
08/31/2026

The Grenell project moves along with installing the 1/4” plywood on the front of the bottom . Later we will laminate 1/4” mahogany over it .

Back from a nice holiday and Matt and I are back on the Gren ell project.shaped the keelson, removed side planking , fit...
08/22/2026

Back from a nice holiday and Matt and I are back on the Gren ell project.shaped the keelson, removed side planking , fit chine and fit first 2 sheets of plywood for bottom . All new wood is being encapsulated with epoxy.

Address

570 Champlain Road
Penetanguishene, ON

Alerts

Be the first to know and let us send you an email when Woodwork by Kevin posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Woodwork by Kevin:

Shortcuts

Share