BC Passive House

BC Passive House Prefabrication company specializing in wood first, high-performance buildings.

05/15/2026

One out, one in. Like clockwork. We barely had time to blink getting these giant glulams loaded out. Expert hoisting by .

Next stop:

We’re putting the finishing touches on some massive glulam beams for an upcoming project with our friends . At 9,000 lbs...
05/12/2026

We’re putting the finishing touches on some massive glulam beams for an upcoming project with our friends . At 9,000 lbs, we pushed the forklift to its limits, and for the 12,000 lb monsters, we had to call in the crane.

Stay tuned to see where these end up!

In progress is the construction of the Ahousaht long house on Flores Island.  provided the structural Glulams for this p...
05/07/2026

In progress is the construction of the Ahousaht long house on Flores Island. provided the structural Glulams for this project. 

This space is designed to be a central gathering place for the Ahousaht First Nation community, supporting cultural events, ceremonies, and community activities.

Learn more about this project at:
https://naikoon.ca/projects/ahousaht-longhouse/

General Contractor:
Architect:
Engineer: .consulting.inc
Mass Timber:

05/05/2026

High-performance epoxy creates a seamless, high-strength bond, securing structural connectors to mass timber beams with lasting durability.

Completed in-shop for precision and quality control.

Currently in the shop, we’ve finished and sent off glulam beams for the Theodore Roosevelt Presidential Library project....
05/01/2026

Currently in the shop, we’ve finished and sent off glulam beams for the Theodore Roosevelt Presidential Library project.

This impressive building is opening on July 4, 2026.



A few more shots from the Samahquam 8 home project.Our panelized system allows for efficient builds no matter how remote...
04/23/2026

A few more shots from the Samahquam 8 home project.

Our panelized system allows for efficient builds no matter how remote the location.

GC:
Architect: .studio
Engineer:

It’s always rewarding to see a project come full circle.Pictured is the Samahquam 8 house project, installed last summer...
04/20/2026

It’s always rewarding to see a project come full circle.

Pictured is the Samahquam 8 house project, installed last summer using prefabricated panels produced locally in our factory.

Delivered in phases, each home achieved 5 days of on-site installation time, including prep and crane time.

We’re grateful to have been part of this exciting project!

GC: Murphy Construction
Architect: Adjacent Studio
Engineer: Skerks Engineering

We had a fantastic time last week unveiling the new 100-seat addition at Westview Elementary. The BC Passive House team ...
03/20/2026

We had a fantastic time last week unveiling the new 100-seat addition at Westview Elementary.

The BC Passive House team is incredibly proud to have been involved in prefabricating this addition. By utilizing a panelized system, this project went from breaking ground in Summer 2025 to completion by February 2026!

Beyond the rapid build speed, mass timber delivers a highly energy-efficient and resilient structure. Even better, the natural wood interiors create a warm, stress-reducing environment where students can thrive.

Swipe to see some highlights from the event and the stunning new classrooms!

GC: Halse-Martin Construction Co. Ltd
Prefab structure: BC Passive House

EducationDesign

It’s all in the details. Cutting and preparing glulams for a project on Flores Island, BC, for the Ahousaht First Nation...
02/27/2026

It’s all in the details.

Cutting and preparing glulams for a project on Flores Island, BC, for the Ahousaht First Nation.

Architect: McFarland Marceau
Engineer: Equilibrium Consulting Inc.

02/13/2026

Aerial views from this summer capture École la Vallée K–12 School taking shape in Pemberton. Surrounded by mountain backdrops, built for the future generation.

General Contractor: Yellowridge
Architecture: Principle Architecture & Local Practice Architecture
Structural: Fast + Epp
Prefabrication: BC Passive House
Video: Mitch Winton Photography

Address

1928 Artisan Road
Pemberton, BC
V0N2K0

Opening Hours

Monday 7:30am - 4pm
Tuesday 7:30am - 4pm
Wednesday 7:30am - 4pm
Thursday 7:30am - 4pm
Friday 7:30am - 4pm

Alerts

Be the first to know and let us send you an email when BC Passive House posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share