08/16/2026
Our customers in East Garafaxa has us over last year to sod after they had a concrete pad installed. This summer we came back to help as they extended the concrete pad and needed a 300 square foot area turned into lawn again. We brought the 50:50 mix soil as a base, 300 square feet of fresh Kentucky Bluegrass sod, and with proper aftercare the lawn will be ready to walk on and cut in 3 weeks.