09/11/2026
The Mara project has come to an end! 🙌
This job was an absolute rollercoaster. The amount of concrete, buried structures and parkade roofs we uncovered while excavating was unbelievable. Every time we thought we had a plan, the ground seemed to have another surprise waiting for us!
We adapted, found solutions and learned a ton along the way. After months of hard work, we completed a new concrete retaining wall, extensive fencing, tree and vegetation removal, raised garden beds, landscaping, drainage, gravel installation and plenty more.
This was one of the largest and most challenging projects we’ve taken on, and I couldn’t be prouder of the transformation or the effort our crew put into it. A huge thank-you to The Mara for trusting Above & Beyond Exterior Designs with this project and to all the residents for their patience throughout the work.
What a difference! Swipe through to see the before-and-after photos. 💪