The Crossing Group

The Crossing Group We make the connections below ground so the world runs smoothly above. We specialize in HDD & tunneling.

We've just added a new Microtunnel Boring Machine (MTBM) to our fleet!MTBMs are remotely operated, providing detailed fe...
06/17/2026

We've just added a new Microtunnel Boring Machine (MTBM) to our fleet!

MTBMs are remotely operated, providing detailed feedback that allows our operators to steer with a high degree of accuracy. They also feature replaceable cutter heads, which can be tailored to a project's specific ground conditions.

This new machine, nicknamed "Margo," will start its journey with The Tunneling Company by completing its first microtunnel in Washington State!

06/09/2026

While installing 335 m (1100 ft) of HDPE conduit in Rhode Island, The Crossing Company had to work within a limited workspace due to surrounding roadways and infrastructure.

Despite this small footprint, our crew was able to arrange the onsite equipment — including a light HDD rig with a mud motor and reclaimer — to accommodate the space while capably drilling through very hard ground conditions.

Incredible work from everyone involved!

Get your bikes tuned up and break out your brightest clothes... the 8th annual "Flashback" Family Fundo will be held on ...
06/01/2026

Get your bikes tuned up and break out your brightest clothes... the 8th annual "Flashback" Family Fundo will be held on Saturday, September 12th 🚲

This all ages-event is the perfect opportunity to relive the 80s while you cycle, enjoy great food, and spend time with friends and family in support of the Kids with Cancer Society.

We'll see you there!

Register your team or donate at: https://kwc.akaraisin.com/ui/familyfundo2026

Did you know that Direct Pipe technology can install pipe diameters ranging from 0.8 - 1.5 m (30 - 60 in)?Our team at Th...
05/28/2026

Did you know that Direct Pipe technology can install pipe diameters ranging from 0.8 - 1.5 m (30 - 60 in)?

Our team at The Trenchless Company uses this methodology to install prefabricated pipelines and excavate boreholes in a single pass. However, if the project requires a pipeline with a diameter less than 0.8 m (30 in), Direct Pipe is still often a viable approach. We can first install a larger-diameter “sacrificial pipe” along the borehole path, then install the final pipe during an additional pass!

The Crossing Group's Direct Pipe® services provide a one pass installation solution with a high degree of steering accuracy. This trenchless method combines the advantages of microtunneling and HDD technology to excavate the required borehole and install prefabricated pipelines at the same time.

Before ➡️  and after!The first photo was taken ahead of horizontal directional drilling operations in Rhode Island, wher...
05/22/2026

Before ➡️ and after!

The first photo was taken ahead of horizontal directional drilling operations in Rhode Island, where our crews were tasked with installing 335 m (1100 ft) of HDPE conduit beneath an exit ramp.

The second photo was taken after project completion, showcasing how trenchless technology can capably work within a small footprint while causing minimal disturbances to the installation area!

Here's to another successful intersect! 🤝 Our crews executed this HDD intersect by simultaneously using a 100,000 lb rig...
05/14/2026

Here's to another successful intersect! 🤝

Our crews executed this HDD intersect by simultaneously using a 100,000 lb rig and a 220,000 lb rig to pass through the site's gravelly ground conditions. This photo shows the drill bits meeting in the middle upon the completion of both pilot bores.

The Tunneling Company is hard at work in California, where they are using our advanced Hydro Hammer system to install a ...
05/07/2026

The Tunneling Company is hard at work in California, where they are using our advanced Hydro Hammer system to install a large-diameter surface casing.

Onsite crews will install 42-inch (1.1 m) steel casing to a depth of 200 ft (60 m) ahead of horizontal directional drilling — which will then be completed by their colleagues at The HDD Company. Hydro Hammer technology is designed for large diameter pipe and long drive lengths, making it the ideal solution for this surface casing installation!

Another successful long-distance crossing from The Crossing Company!Reaching a total distance of 1,747 meters, this hori...
04/30/2026

Another successful long-distance crossing from The Crossing Company!

Reaching a total distance of 1,747 meters, this horizontal directional drilling project utilized gyro steering to precisely navigate a right-of-way corridor with an existing hotline. Our crews overcame this technical challenge — along with an entry angle of 26 degrees — to safety install a 12-inch product line beneath the Beatton River in Northeast B.C.

04/22/2026

When encountering challenging ground conditions, our crews need to be versatile to ensure a successful crossing.

Here's a brief explanation of how a horizontal directional drilling (HDD) team might work through a site with soft surficial material over a bedrock layer!

The Crossing Company is using a heavy HDD rig to complete a high angle installation near Pink Mountain, B.C. ⛰️ With 440...
04/15/2026

The Crossing Company is using a heavy HDD rig to complete a high angle installation near Pink Mountain, B.C. ⛰️

With 440,000 lbs of available push or pull force, this rig is reaming the pilot hole to an 18-inch diameter before installing the pipeline!

Address

Nisku, AB

Alerts

Be the first to know and let us send you an email when The Crossing Group posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share