10/09/2026
When the call comes in after hours, our team is ready to make it happen!
Recently, our crews responded to two completely different situations at separate locations, both with the same goal: getting power back where it belongs.
At one location, our team was up in the bucket checking primary line voltage to track down a loss of power, ultimately identifying a blown downstream fuse.
At another, our crew was on the ladder installing TECK cable to help restore power to an industrial facility.
Two different challenges, two different locations, and one incredible team ready to get the job done.
At the end of the day, it’s our people who make the difference. Their knowledge, adaptability, and commitment to getting the job done safely are what we’re proud of.
After hours, on call, or on the job, we make it happen!