En tant que l'une des plus grandes entreprises privées de construction en Amérique du Nord, nous offrons des services d'entreprise générale dans tous les aspects de la planification, de l'exécution et de la livraison de projets. As one of the largest privately-owned construction companies in North America, we offer general contracting services in all aspects of project planning, execution and delivery.

12/19/2025

As we close out another remarkable year, we’re proud to reflect on the projects we’ve delivered and those actively transforming skylines and communities. Every site, milestone, and achievement represents the trust of our clients, the strength of our partnerships, and the unwavering dedication of our team.

With an exciting lineup of new projects ahead, we’re stepping into the New Year energized, focused, and ready to build more than ever before. We’re grateful for what’s to come and eager to continue growing, innovating, and raising the bar together.

We’re coming back stronger than ever in the New Year — ready to take on bold challenges and create truly incredible projects. Here’s to what we’ve built and everything that lies ahead. 🏗️✨

Alors que nous terminons une autre année remarquable, nous prenons un moment pour souligner les projets livrés ainsi que ceux qui façonnent actuellement nos communautés et nos horizons urbains. Chaque étape franchie reflète la confiance de nos clients, la force de nos partenariats et le dévouement constant de notre équipe.

Avec de nouveaux projets passionnants à l’horizon, nous abordons la nouvelle année motivés, confiants et prêts à relever de nouveaux défis. Ensemble, nous continuerons de bâtir, d’innover et d’élever nos standards. Merci à tous ceux qui contribuent à ce succès — l’avenir s’annonce prometteur. 🏗️✨

🎉 TOPPING OFF AT CF LAVAL 🏗️ A major milestone has been reached on site as we officially top off the CF Laval project — ...
12/02/2025

🎉 TOPPING OFF AT CF LAVAL 🏗️
A major milestone has been reached on site as we officially top off the CF Laval project — marking the completion of the building’s highest structural level and a huge step forward for the development.

Our team’s precision, coordination, and commitment have brought us to this moment, and strong progress continues across all areas of the project.

Current Construction Progress

• 20th-floor concrete slab completed, officially topping off the structure
• Building envelope (stud walls, membrane, windows, insulation) progressing up to the 11th floor
• Brickwork underway
• Elevator work started in the West Tower
• Interior suite construction active from the 2nd to the 5th floors
• Drywall installation about to begin
• One tower crane removed, with only one remaining
• 6th-floor terrace pool structure completed
• Main civil infrastructure completed (sewer, aqueduct, electrical entry)

Looking Ahead

With the structure now officially topped off, the next phase accelerates: envelope completion, interior build-outs, mechanical and electrical installations, and exterior finishes.

👏 A huge thank-you to our site team, superintendents, partners, and all trades for their exceptional work and collaboration.
Another milestone achieved — and CF Laval continues to rise.





🎉 CF Laval – Étape du Topping Off atteinte! 🏗️
Nous célébrons un jalon majeur : la structure du projet CF Laval est officiellement complétée jusqu’au 20e étage.

Avancement des travaux

• Dalle de béton du 20e étage terminée
• Enveloppe du bâtiment en progression jusqu’au 11e étage
• Maçonnerie débutée au coin nord-ouest
• Travaux d’ascenseurs en cours dans la tour Ouest
• Finition intérieure en cours du 2e au 5e étage
• Début du gypse à venir
• Un seul grue désormais en opération
• Structure de la piscine au 6e étage complétée
• Infrastructure civile terminée (égouts, aqueduc, entrée électrique)

👏 Merci à toute l’équipe et aux partenaires pour leur travail exceptionnel. Une autre étape franchi

🔙 Flashback to 2011 — one of Reliance Construction’s very first projects in Toronto: Aura Condominiums, proudly delivere...
11/25/2025

🔙 Flashback to 2011 — one of Reliance Construction’s very first projects in Toronto: Aura Condominiums, proudly delivered colloaboratively for and their team.

Aura wasn’t just a major addition to the Toronto skyline — it was a milestone project for our company. Beyond the scale and complexity of the tower, one logistical challenge stood above the rest: keeping the existing loading dock serving 777 Bay St. fully operational throughout construction.

To achieve this, our team implemented a rare and highly coordinated solution at the time: Top-Down Construction. Before any foundations could be excavated, we built a reinforced concrete tunnel supported on structural steel at the street level, spanning the entire depth of the podium. This allowed loading dock operations to continue uninterrupted while excavation and structural work progressed below.

The photos above bring us right back to those early days on site — navigating tight logistics, working around active operations, and coordinating with incredible partners to deliver a landmark building.

Projects like Aura helped shape who we are today: a builder that thrives on complexity, collaboration, and innovative solutions.



🔙 Retour en 2011 — l’un des tout premiers projets de Reliance Construction à Toronto : Aura Condominiums, réalisé en collaboration avec Canderel.

Aura n’était pas seulement un ajout majeur au paysage urbain, mais aussi un projet marquant pour notre équipe. L’un des plus grands défis : maintenir en fonction le quai de livraison du 777 Bay St. pendant toute la construction.

Pour y parvenir, nous avons mis en place une solution rare à l’époque : une construction Top-Down, incluant un tunnel en béton armé supporté par une structure d’acier, permettant aux opérations de se poursuivre pendant que l’excavation avançait en dessous.
Ces photos nous replongent dans ces moments où la coordination, l’ingéniosité et la collaboration étaient essentielles.

Aura a contribué à définir notre identité : un constructeur qui excelle dans la complexité et l’innovation.

🏗️ 70 Nicholas – Project Progress Update Significant strides continue to shape the 70 Nicholas development in Ottawa, wi...
11/21/2025

🏗️ 70 Nicholas – Project Progress Update

Significant strides continue to shape the 70 Nicholas development in Ottawa, with key structural, mechanical, and finishing milestones now achieved across the site. Our team is advancing with precision and momentum as we move into the next phase of construction.

✨ Main Tower Advancements
• Construction hoist removed with a smooth elevator turnover
• Pool mechanical room and main mechanical room completed
• Landscaping well underway
• Drywall boarding complete across all condominium floors
• Curtain wall installation progressing toward full enclosure at podium levels

🏛️ Heritage Building Progress
• Interior backfilling, including mechanical and electrical, completed
• Windows and slate roof installation currently in progress

⚡ Project-Wide Milestones
• Permanent power and distribution established
• Balcony railings fully installed
• Drywall boarding in common areas advancing on schedule
• Flooring installations well underway, with some units already completed

Every milestone brings us closer to delivering an exceptional residential experience in the heart of Ottawa. More updates coming soon as 70 Nick continues to take shape.

🏗️ 70 Nicholas – Mise à jour des travaux

Le projet progresse avec constance, atteignant plusieurs jalons structuraux, mécaniques et de finition à travers le site. L’équipe avance avec précision alors que nous entrons dans les prochaines phases de construction.

✨ Avancement de la tour principale
• Retrait du monte-charge et mise en service des ascenseurs
• Salles mécaniques, incluant celle de la piscine, complétées
• Aménagement paysager en cours
• Pose des cloisons terminée dans tous les étages condos
• Installation du mur-rideau en progression au podium

🏛️ Bâtiment patrimonial
• Remblayage intérieur complété, incluant mécanique et électricité
• Fenêtres et toiture en ardoise en cours d’installation

⚡ Jalons du projet
• Alimentation électrique permanente en service
• Garde-corps des balcons installés
• Cloisons dans les espaces communs en cours
• Pose des planchers bien avancée, certaines unités déjà complétées

🎉 Topping Off at 908 St. Clair! 🎉Our 908 St. Clair West project has officially topped off — a major milestone for the en...
11/20/2025

🎉 Topping Off at 908 St. Clair! 🎉

Our 908 St. Clair West project has officially topped off — a major milestone for the entire team!
This achievement is especially meaningful given the site challenges: neighbouring properties sit 20–25 ft higher, requiring 7,000 tonnes of material to build a safe drill platform, a caisson wall at the proper elevation, and a ramp system for the drill rig to descend once work was done. Reaching the top is a true testament to our team’s expertise and coordination.

We’re proud to continue our partnership with on this 12-storey mid-rise in Toronto’s vibrant St. Clair Village. Once complete, the project will feature:

🏙️ 173 units — from modern 1-bedrooms to spacious 3-bedroom penthouses

✨ High-end interiors with radiused kitchens, premium appliances & luxury finishes

🏢 A refined façade with architectural precast, Window Wall & metal panels

👏 Huge thank you to the whole team. More updates coming soon!

🎉 Sommet Atteint au 908 St. Clair ! 🎉

Le projet a officiellement atteint son sommet !
Avec des terrains voisins 20–25 pieds plus hauts, il a fallu 7 000 tonnes de matériaux, un mur de caissons et une rampe sécurisée pour compléter le forage. Atteindre ce point prouve la force et la précision de l’équipe.

En collaboration avec , ce bâtiment de 12 étages offrira :

🏙️ 173 unités — des 1 chambre modernes aux penthouses 3 chambres

✨ Des intérieurs haut de gamme avec cuisines arrondies & finitions luxueuses

🏢 Une façade moderne en béton préfabriqué, Window Wall & panneaux métalliques

👏 Bravo à toute l’équipe ! D’autres nouvelles arrivent.

Project Complete at 435 René-Lévesque! 🎉 From the first residents moving in to the final touches now complete, Phase 2 o...
11/11/2025

Project Complete at 435 René-Lévesque! 🎉

From the first residents moving in to the final touches now complete, Phase 2 of Le Livmore has officially wrapped. The striking 45-storey tower — built above an occupied 8-storey podium with custom-engineered steel supports — now stands proudly in the Montreal skyline, marked by its iconic K-shaped design.

Common areas, rooftop amenities, landscaping, and retail spaces are now fully finished, bringing to life a vibrant 820-unit rental community in the heart of downtown.

Thank you to all our incredible partners for your expertise and dedication on this journey.

Welcome to the fully completed Phase 2! 🏗️✨





Thank you to our incredible partners
— your expertise, dedication, and teamwork made this milestone possible. We couldn’t have reached this stage without you.



Projet complété au 435 René-Lévesque! 🎉

Du premier résident aux dernières finitions, la Phase 2 de Le Livmore est maintenant officiellement terminée. Cette tour de 45 étages — construite au-dessus d’un podium occupé grâce à une ingénierie d’acier sur mesure — se distingue par son design iconique en “K” dans le paysage montréalais.

Les aires communes, les aménagements sur le toit, le paysagement et les espaces commerciaux sont désormais finalisés, donnant vie à une communauté locative de 820 unités en plein cœur du centre-ville.

Merci à nos partenaires pour leur expertise et leur dévouement. 🙏

Bienvenue à la Phase 2 entièrement complétée! 🏗️✨

Our  renovation and expansion project, completed on behalf of , has officially reached completion! The newly renovated 3...
11/07/2025

Our renovation and expansion project, completed on behalf of , has officially reached completion! The newly renovated 38,000 sq. ft. dealership now unites both BMW and MINI under one roof, offering a modern and seamless experience for customers. This location is also one of the first in Canada — and the very first in Quebec — to feature the “BMW Retail.Next” concept. Designed by Denommée Architectes, the building features the newest BMW design; a stunning contemporary look with aluminiumpanels throughout, a double height curtain wall façade, and an integrated solar wall that highlights both innovation and sustainability. We’re very fortunate to work alongside Park Avenue and we are very proud to see this project come to life and to have contributed to such a forward-thinking automotive space.




Notre projet de rénovation et d’agrandissement de , réalisé pour le compte de , est maintenant complété !
Le nouveau concessionnaire de 38 000 pi² réunit désormais BMW et MINI sous un même toit, offrant une expérience moderne et harmonieuse à la clientèle. Ce site devient également le premier au Québec et l’un des premiers au Canada à présenter le concept novateur « BMW Retail.Next ».
Conçu par Denommée Architectes, le bâtiment adopte la toute dernière signature de design BMW : un style contemporain remarquable avec des panneaux d’aluminium, une façade mur-rideau à double hauteur et un mur solaire intégré, mettant de l’avant l’innovation et la durabilité.
Nous sommes très heureux d’avoir collaboré avec Park Avenue et extrêmement fiers d’avoir contribué à la réalisation de ce projet visionnaire dans le domaine automobile.



🚧 Project Update | Crescent 🏗️ Progress is moving full speed ahead at our Crescent project! The building envelope has be...
11/05/2025

🚧 Project Update | Crescent 🏗️

Progress is moving full speed ahead at our Crescent project! The building envelope has been fully completed — an incredible achievement, completed in just 12 working days. 👏

The roof installation is now complete, and boarding is well underway on the first four floors. Next week, ceramic installation begins in all bathrooms, while painting is already in progress throughout the building.

We’re proud to share that the project remains on schedule for delivery in May 2026 — right on track!

Another exciting milestone as the Crescent project continues to take shape.




Thank you / Merci to : Architect FRWA, , LJP formwork contractor, AGF rebar contractor, ACF Cement finisher , BPDL Precast Concrete, Altek for Windows , Équipe SP and finally Rester Inc.


🚧 Mise à jour du projet | Crescent 🏗️

Le chantier du projet Crescent avance à plein régime! L’enveloppe du bâtiment est entièrement complétée — un accomplissement remarquable réalisé en seulement 12 jours ouvrables. 👏

Le toit est maintenant terminé, et la pose des panneaux de gypse progresse bien sur les quatre premiers étages. La semaine prochaine, nos équipes entameront l’installation de la céramique dans toutes les salles de bain, tandis que la peinture est déjà en cours à travers le bâtiment.

Nous sommes fiers d’annoncer que le projet demeure sur la bonne voie pour une livraison prévue en mai 2026, conformément au calendrier établi.

Une autre étape importante franchie alors que le projet Crescent continue de prendre forme!

We’re proud to announce the completion of the AC Marriott Old Montreal renovation — a full transformation redefining mod...
10/31/2025

We’re proud to announce the completion of the AC Marriott Old Montreal renovation — a full transformation redefining modern hospitality.

This extensive project included a complete gut and rebuild of all guest rooms, introducing new layouts and larger, luxurious bathrooms with redesigned showers, vanities, and fixtures. The lobby was fully reimagined with high-end custom millwork, a modern full-service bar, walnut paneling, coffered ceilings, and integrated mood lighting.

A brand-new commercial kitchen, updated public washrooms, modern fitness center, and refreshed conference rooms were also delivered. Fire-rating and code upgrades were completed throughout, ensuring safety and quality at every level.

Delivered turnkey, the property now meets AC Marriott’s brand standards, blending elegance, comfort, and sophistication.

Special thanks to
for their trust and collaboration, and to the team for their exceptional vision.



Nous sommes fiers d’annoncer la complétion du projet de rénovation de l’hôtel AC Marriott Vieux-Montréal, une transformation complète qui redéfinit l’hospitalité moderne.

Le projet a consisté en une rénovation majeure — toutes les chambres ont été entièrement démolies jusqu’à la structure périphérique, puis reconstruites avec de nouveaux aménagements et des salles de bain agrandies, dotées de douches, vanités et finis haut de gamme.

Le hall d’entrée a été complètement repensé avec un design contemporain, comprenant un bar moderne à service complet, des panneaux de noyer, des plafonds à caissons architecturaux et un éclairage intégré à ambiance programmable.

Une toute nouvelle cuisine commerciale et des toilettes publiques ont été ajoutées, en plus d’un centre de mise en forme moderne et de salles de conférence actualisées. Le bâtiment a également bénéficié d’améliorations majeures en matière de sécurité incendie et de conformité aux codes.

Livré clé en main, ce projet aligne désormais la propriété aux normes de la marque AC Marriott, alliant élégance, confort et raffinement.

🚧 Progress in Motion at Bayview Village Redevelopment! 🏗️ QuadReal Property Group’s Bayview Village redevelopment has re...
10/22/2025

🚧 Progress in Motion at Bayview Village Redevelopment! 🏗️

QuadReal Property Group’s Bayview Village redevelopment has reached a remarkable milestone with the completion of its first major concrete pour — marking the beginning of a significant construction phase for this transformative project.

Over 12 hours, a total of 1,500 m³ of 55 MPa concrete was placed using two 57-ft pumps and a tower crane, ensuring consistent and precise distribution across the raft slab. Prior to the pour, the team installed over 350 tones of reinforcing steel, a feat that required weeks of meticulous coordination, detailed planning, and skilled craftsmanship.

This milestone sets the foundation for three new residential towers and retail promenade that will redefine and enhance Bayview Village Shopping Centre.

We extend our gratitude to Limen for their outstanding performance and teamwork, Dufferin for their exceptional concrete delivery, and the entire site team whose hard work and dedication made this achievement possible.

As we prepare to install the next and final tower crane, we’re counting on our partners and suppliers to keep the momentum going as the structure continues to rise.



Le projet de QuadReal Property Group franchit une étape importante avec la réalisation du premier coulage majeur de béton, marquant le début d’une phase clé de ce développement transformateur.
En 12 heures, plus de 1 500 m³ de béton de 55 MPa ont été coulés à l’aide de deux pompes de 57 pi et d’une grue à tour, assurant une distribution uniforme et précise sur la dalle de radier. Avant le coulage, l’équipe a installé plus de 350 tonnes d’acier d’armature, fruit de semaines de coordination minutieuse et de savoir-faire exceptionnel.

Cette étape jette les bases des trois nouvelles tours résidentielles et de la promenade commerciale qui redéfiniront le Bayview Village Shopping Centre.
Un grand merci à Limen pour son exécution remarquable, à Dufferin pour la qualité de son service, et à toute l’équipe pour son engagement et son travail exceptionnel.

Address

3285 Jean-Baptiste Deschamps
Montreal, QC
H8T3E4

Opening Hours

Monday 8am - 4:30pm
Tuesday 8am - 4:30pm
Wednesday 8am - 4:30pm
Thursday 8am - 4:30pm
Friday 8am - 4:30pm

Telephone

+15146317999

Alerts

Be the first to know and let us send you an email when Reliance Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Reliance Construction:

Share