What started as a simple two-pillar replacement turned into a complete front entrance restoration. π
The client originally called us to replace two damaged pillars. Once we opened everything up, we discovered serious hidden water damage and rot caused by improper capping from the previous stucco installation. Water had been getting behind the moulding and into the structure for years.
Simply replacing the pillars would not have been safe, so our team took care of the entire repair from start to finish.
All handled by one team: demolition, structural framing, flat-roof repair and waterproofing, stucco/EIFS, new moulding, metal capping, caulking, and complete finishing.
We rebuilt the front canopy properly, corrected the water-management details, and gave the entrance a clean, modern new look.
Small repair turned into a complete solution β done properly from the inside out.