Jim Weeks Construction

Jim Weeks Construction General Contractor

03/16/2025
09/23/2024

Here is a preview of the renovation

We just completed an exciting main level renovation, and the results are stunning! By removing a wall, we’ve created a s...
09/23/2024

We just completed an exciting main level renovation, and the results are stunning! By removing a wall, we’ve created a spacious open-concept layout that brings in tons of natural light and enhances flow throughout the area.

Our new custom cupboards not only add style but also maximize storage, making the kitchen both functional and beautiful. The fresh flooring ties everything together, providing a warm and inviting feel.

To top it all off, we’ve painted throughout with a modern color palette that breathes new life into the space. This transformation truly elevates the heart of the home!

Stay tuned for more updates and photos of our journey!

Poor ventilation in the attic caused moisture in the wood. To fix this issue wood soffit was removed, true vents and new...
06/19/2024

Poor ventilation in the attic caused moisture in the wood. To fix this issue wood soffit was removed, true vents and new vented vinyl soffit was installed to allow for more airflow. Check it out in one month the wet boards in attic we’re like new again

Drilled post holes, installed carrying beams for floor joists, decking to create deck on 3 sides of cottage. This projec...
06/18/2024

Drilled post holes, installed carrying beams for floor joists, decking to create deck on 3 sides of cottage. This project includes built in seating and installed stairs

While replacing an exterior door I identified the floor, box still and studs right down to the top of the foundation wer...
06/18/2024

While replacing an exterior door I identified the floor, box still and studs right down to the top of the foundation were rotted. This job involved removal of a section of the deck and vinyl siding, to access repair of the wall by removing rotted materials and replacing with new material. Finish by reinstalling the siding and deck before installing the new door. This was all part of a days work.

Old farmhouse got a new roof
06/18/2024

Old farmhouse got a new roof

An outdoor shed 12 x 16 got a new face lift two windows, garage door and vinyl shingles 
06/18/2024

An outdoor shed 12 x 16 got a new face lift two windows, garage door and vinyl shingles 

I highly recommend removing asphalt shingles prior to installing steel on the roof. Failing to do so will cause the stee...
06/18/2024

I highly recommend removing asphalt shingles prior to installing steel on the roof. Failing to do so will cause the steel to rust that is installed against the asphalt. 

Tardy Avenue ProjectRemoved all asphalt shingles, installed ice and water shield, 29 gauge steel, snow guards, rake flas...
04/25/2024

Tardy Avenue Project
Removed all asphalt shingles, installed ice and water shield, 29 gauge steel, snow guards, rake flashings and vented ridge cap.

Eel Ground Project Removed old 8x12 deck around pool. Built new 16x28 upper deck and lower deck 8x 16 to mould to shape ...
04/25/2024

Eel Ground Project
Removed old 8x12 deck around pool. Built new 16x28 upper deck and lower deck 8x 16 to mould to shape of pool, and a platform at ground level for BBQ.
Kept existing stairs as per customer request.

New roof project completed in the past few days, stripped to bare boards, replaced rotten boards shingled, tarred,  and ...
04/13/2024

New roof project completed in the past few days, stripped to bare boards, replaced rotten boards shingled, tarred, and straight as an arrow.

Address

Miramichi, NB

Telephone

+15066260970

Website

Alerts

Be the first to know and let us send you an email when Jim Weeks Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share

Category