08/26/2026
Some before and after photos of the job we completed at a local school redoing a neglected baseball diamond and running track. We worked the existing material up and removed all the weeds, leveled the old material and packed for a solid base, and then added 36 tonnes of specialty baseball mix material to the diamond, and 92 tonnes of limestone screenings to the track, and then re-packed it with the 5 ton roller to finish it off!