Coming to you live from our office on Vancouver Island! Blackrete Builders has our weekly update on site progress brought to you live from our team in the field!

This video showcases the current status of the Excavation for a new multi-family residential project in Langford, BC.

We can see the excavator cutting a test window for the shoring contractor to install shotcrete shoring.

02/06/2026

Week 2 progress included bulking out material and installing several pipe piles. We've also set up the site facilities and are ready for another week of action!

Let us know in the comments what you're most excited to see next!

In this video we see the Excavation progress onsite as material has been hauled away since the last update. The Piling contractor is drilling piles and maintaining schedule onsite.

01/30/2026

We're excited to announce that Excavation and Pile installation is underway in Langford!

Blackrete Builders is working with a local developer to deliver a 6-storey wood frame multi-family residential project with 75 rental units and 2 levels of underground parking.

Follow our page for more updates!

In this video, we show the progress from our first week onsite. The Excavation contractor is hauling out soil and the Piling contractor is installing pipe piles that will stabilize the Excavation as we dig!

🚧 Building the Future, One Project at a Time 🚧Blackrete Builders is proud to be working alongside incredible partners on...
09/06/2025

🚧 Building the Future, One Project at a Time 🚧

Blackrete Builders is proud to be working alongside incredible partners on two exciting projects:

👷‍♂️ Arbutus Landing – In collaboration with Orion Construction (https://orionconstruction.ca), our team is driving progress on this landmark development that will shape the community for years to come.

🌊 Victoria Waterway Sidewalk Project – Partnering with Hazelwood Construction (https://www.hazelwoodconstruction.com), we’re making an impact near Montreal Street, enhancing the infrastructure along Victoria’s iconic waterfront.

At Blackrete, every build is more than just concrete and steel—it’s about safety, teamwork, and creating lasting value for the communities we serve.

Blackrete working alongside SlabTec. We killed it!! 17,000sq.  800m3. Placed and finished before dinner time. Great work...
07/19/2025

Blackrete working alongside SlabTec. We killed it!! 17,000sq. 800m3. Placed and finished before dinner time. Great work all!!!

Oak & Stone Project Update:One slab down, one more to go.Another big push from the crew this week — formwork stripped, w...
05/08/2025

Oak & Stone Project Update:
One slab down, one more to go.
Another big push from the crew this week — formwork stripped, walls up, and slab on grade poured. Always feels like a win when the excavator gets flown out and the next phase begins.
Shoutout to everyone keeping things tight and moving at Oak & Stone.

https://abstractdevelopments.com/developments/oak-stone/

We hosted a successful   at our UA Local 324 project site in recognition of BC Construction Month 2025. With support fro...
05/02/2025

We hosted a successful at our UA Local 324 project site in recognition of BC Construction Month 2025. With support from BCCA, 32 staff were treated to a well-deserved lunch. The “Built Right” shirts were proudly worn on-site, and we made sure to capture a variety of individual and group photos during the event.

Stay safe everyone.
04/28/2025

Stay safe everyone.

Erskine 7 Update:Our suspended LV 2 slab is coming along smoothly at Erskine 7! Concrete pour in progress, formwork hold...
03/22/2025

Erskine 7 Update:
Our suspended LV 2 slab is coming along smoothly at Erskine 7! Concrete pour in progress, formwork holding strong, and the team at Blackrete Builders keeping everything on track. Another step closer to completion! 👷‍♂️💪

Check out the progress and follow the project here: Erskine 7 Development

Progress at Local 324 Project:CLT floor system install went smooth! ✅ LVL 2 walls are now well underway. Solid progress ...
03/22/2025

Progress at Local 324 Project:
CLT floor system install went smooth! ✅ LVL 2 walls are now well underway.
Solid progress at the Local 324 Headquarters.
💪🏗️

Blackrete Builders Progress Update Grand & Fir Over the past month, our crew alongside GT Mann and 1618 Workers has been...
03/03/2025

Blackrete Builders Progress Update Grand & Fir

Over the past month, our crew alongside GT Mann and 1618 Workers has been making huge strides at the Grand & Fir project in View Royal! With Spring weather on the horizon, we’re keeping the momentum strong as this exciting development takes shape.

🔹 Concrete Pours & Columns: Progress continues as we move through each phase efficiently.
🔹 Formwork & Decking: Our team is executing every step with expertise, setting the stage for the next milestones.
🔹 Safety & Efficiency: Through changing conditions, we remain committed to high standards and safe work practices.

Big shoutout to everyone on-site for their hard work and dedication! Warmer days are ahead, and we’re excited to keep pushing forward on this incredible project.

📍 Learn more about Grand & Fir here: thegrandandfir.com