When Overlanders Manufacturing needed to replace an existing liquid nitrogen tank with a much larger one, the solution required more than simply pouring a bigger concrete pad.
Moore & Sons removed the existing foundation and surrounding asphalt, excavated 28 inches across a 25' × 28' area, and built a new 21' × 24' × 2'-deep reinforced concrete foundation.
The new slab included:
• Double rebar reinforcement with 25 mm and 20 mm rebar
• Geotechnical and structural inspections
• City of Abbotsford approval
• 40 m³ of 32 MPa concrete
• 12 six-inch steel bollards for added protection
From excavation and preparation to reinforcement, inspections and the final concrete pour, every step was important in creating a foundation capable of supporting the new, larger tank.