08/25/2026
This North York bathroom shows two stages of the same shower area, from the completed drypack base to the tile installation that followed.
The drypack establishes the required slope and creates a solid, properly prepared surface for the tile. Once the base is ready, the tile can be installed with careful attention to layout, alignment, and transitions around the tub.
Visit the link in our bio to explore more of our tile and renovation projects.
π Bilby Gomes - Toronto & GTA ON
β’
β’
β’