10/08/2026
Take a look at the size of these piles. At 1.2 metres in diameter and up to 18 metres long, each one has to be delivered to the Highway 97 Cottonwood Hill Phase 3 stabilization project site, positioned, and driven into the ground ā 252 times over.
Full project details: www.dawsoncivil.ca/highway-97-cottonwood-hill