02/04/2026
Excited to be getting into this project. It is going to be an amazing transformation as it takes shape. Glad to be working with on such an involved project. With extensive shoring and new floor systems for all three levels. We are working closely with the engineers as we erect temporary shoring beams, remove existing sections, joist and re-shore throughout the house. Planning the order of operations is crucial to minimize the necessary shoring and streamline the removal process. The existing LVL beams from a previous renovation were a useful surprise. With 27 steel beams, moment frames and sloped HSS in the roof- laying out our grid lines, double checking elevations and staying one step ahead is crucial, and always nice when the brick to brick dimensions just add up 👌 per plans.🤞 📐