08/29/2026
Two decks. Down to the framing. Back up in composite.
Bob & Sharon brought us in on a cost-plus basis for both the rear deck and the front entry. Full pressure-treated framing replacement, new blocking throughout, and joists swapped where needed — then composite decking and black aluminum railing over top.
Anything that didn't meet code got corrected along the way, and the whole thing came in just under budget.
Swipe for the before and after, and their review on the last slide. Hats off to Chris and his crew.
Booking deck rebuilds now — send us a message.
📍 Fort Saskatchewan & Greater Edmonton